Laserfiche WebLink
SWRCB , January 2006 <br /> Spill Bucket Testing Report Form <br /> This form is intendedfor use by contractors performing annual testing of UST spill containment structures. The completed form and <br /> printouts from tests (f applicable), should be provided to the facility owner/operator for submittal to the local regulatory agency. <br /> 1 . FACILITY INFORMATION <br /> Facility Name : Fast & Easy Morada #60 (Stockton) Date of Testing : 4/11 /19 <br /> Facility Address : 10878 N Highway 99 Stockton 95212 <br /> Facility Contact: Asim Phone : (707) 393-9859 <br /> Date Local Agency Was Notified of Testing : 3-21 -19 <br /> Name of Local Agency Inspector (if present during testing) : Stacy Rivera <br /> 2 . TESTING CONTRACTOR INFORMATION <br /> Company Name : Confidence UST Services , Inc, <br /> Technician Conducting Test: Timothy Capehart <br /> Credentials ' : CSLB Contractor DICC Service Tech. 0 SWRCB Tank Tester Other (Spec) <br /> License Number(s) : 804904 8414476 <br /> 3 . SPILL BUCKET TESTING INFORMATION <br /> Test Method Used : E✓ Hydrostatic ❑ Vacuum ❑ Other <br /> Test Equipment Used : Lake Test Equipment Resolution : 0.0625" <br /> Identify Spill Bucket (By Tank 1 2 3 4 <br /> Premium- 1 Premium-2 Unleaded Diesel <br /> Number, Stored Product, etc) <br /> Bucket Installation Type : ® Direct Bury 0 Direct Bury 0 Direct Bury ® Direct Bury <br /> ❑ Contained in Sump ❑ Contained in Sump ❑ Contained in Sump ❑ Contained in Sump <br /> Bucket Diameter: 11 .0" 11 .0" 11 .0" 11 . 0" <br /> Bucket Depth: 11 .0" 12.5" 12.5" 12.5" <br /> Wait time between applying <br /> 5 min 5 mins 5 mins 5 mins <br /> vacuum/water and start of test: <br /> Test Start Time (TI ) : 1 :30pm 1 :30pm 2:30pm 1 :30pm <br /> Initial Reading (RI) : 11 .0" 12.0" 12.0" 12.0" <br /> Test End Time (TF) : 2 :30pm 2:30pm 3:30pm 2:30pm <br /> Final Reading (RF ) : 11 .5" 12.0" 12.0" 12. 0" <br /> Test Duration (TF — Ti ) : 60 mins 60 mins 60 mins 60 mins <br /> Change in Reading (RF - RI ) : 0.5" 0. 0" 0. 0" 0 . 0" <br /> Pass/Fail Threshold or <br /> 0.0625" 0. 0625" 0.0625" 0 .0625" <br /> Criteria: <br /> Test Result. ❑ Pass 0 Fail 0 :Pass ❑ Fail 0 Pass ❑ Fail 0 Pass ❑ Fail <br /> Comments — (include information on repairs made prior to testing, and recommended follow-up for failed tests) <br /> The Premium 10 OPW fill spill bucket does not hold 5 gallons Due to being a direct buried OPW spill bucket we will have to return and break concrete <br /> to make riser adjustments , replace and retest the spill bucket. Unleaded OPW fill spill bucket failed hydrostatic test due to leaking fill cap. Replaced cap <br /> -and retested with pa s . <br /> CERTIFICATION OF TECHNICIAN RESPONSIBLE FOR CONDUCTING THIS TESTING <br /> I hereby certify that all the information contained in this report is true, accurate, and in full compliance with legal requirements. <br /> i <br /> Technician ' s Signature : Date : 4/11 /19 <br /> ' State laws and regulations do not currently require testing to be performed by a qualified contractor. However, local requirements <br /> may be more stringent. <br />