Laserfiche WebLink
KEYNOTES - ELECTRICAL & PLUMBING PLANS _ <br /> 1 ELECTRICAL CONTRACTOR SHOULD VERIFY ALL KITGHENlPREP,AREA RECEPTACLE -� <br /> OUTLETS SHALL BE GFCI PROTECTED PER CEC 210.8 <br /> 2 EXISTING POWER&SIGNAL IN THIS AREA SHALL REMAIN IN SERVICE.ELECTRICAL <br /> CONTRACTOR SHALL FIELD VERIFY THE EXISTING BRANCH CIRCUIT IN EXISTING PANEL. <br /> ANY DISCREPANCY FOUND BETWEEN THE DRAWINGS AND ACTUAL INSTALLATION <br /> SHOULD BE IMMEDIATELY REPORTED TO THE ENGINEER UNDERSIGNED BEFORE <br /> TURNING ON THE SERVICE. <br /> 3 ELECTRICAL CONTRACTOR TO COORDINATE WITH ARCHITECT OR KITCHEN EQUIPMENT <br /> VENDOR THE ACTUAL LOCATION/MOUNTING HEIGHT OF RECEPTACLE FOR KITCHEN <br /> EQUIPMENT UPON INSTALLATION. <br /> 4 ELECTRICAL CONTRACTOR SHALL FIELD VERIFY THE SIZE/RATING OF ALL ELECTRICAL <br /> EQUIPMENT AND COMPARE WITH THE DRAWINGS ANY DISCREPANCY FOUND BETWEEN <br /> THE DRAWINGS AND ACTUAL INSTALLATION SHOULD BE IMMEDJATELY REPORTED TO THE <br /> ENGINEER UNDERSIGNED BEFORE TURNING ON THE SERVICE. <br /> 5 NEW COLD/HOT WATER PIPE CONNECT TO(E)TOILET PIPING.VERIFY PIPE SIZE <br /> REQUIREMENTS MEET NEW LOAD.VERIFY POINT OF CONNECTION PER SITE CONDITION. <br /> 6 (E)TOILET TO BE RELOCATED PER PLAN,REROUTE NEW PLUMBING TO NEW LOCATION <br /> 7 (E)LAVATORY TO REMAIN <br /> 8 (N)3"S PIPE CONNECT TO(E)SEWER LINE,VERIFY THE POINT OF CONNECTION PER SITE <br /> CONDITION. <br /> 9 (N)3"S PIPE CONNECT TO(E)SEWER LINE.VERIFY THE POINT OF CONNECTION PER SITE <br /> CONDITION. <br /> 10 EXISTING ELECTRICAL PANEL. ELECTRICAL CONTRACTOR TO VERIFY AMPERAGE MEETS <br /> PROPOSED DEMAND LOAD <br /> e.01�ESsloMENINEWN <br /> L <br /> c� C 68198 <br /> ' ❑ El ❑ ❑ <br /> V , <br /> , <br /> �r <br /> OF C <br /> F„.......` <br /> ; <br /> s' <br /> E <br /> i.., <br /> ............... .......... <br /> i <br /> RRi <br /> .r <br /> - - -2"V– T – '- - - ° <br /> EQ-9 <br /> ink <br /> EQ 1 f--- <br /> EQ-1 <br /> EQ 8 5 v\ <br /> EQ-4 EQ-5 3.i S 3,i S 3"S 3”5 N <br /> EQ-12 <br /> EQ-4 EQ-5 — -----HWS---CWS-----� <br /> 3 S� — _-- -- - - <br /> CEO <br /> r <br /> - - - - - - - - "'- 2"V <br /> i, <br /> - ` <br /> \� <br /> .. SMIM \ `\ <br /> o <br /> Im <br /> EQ-7 <br /> EQ-7 <br /> LL <br /> SEWERIV'LNT PLANWATER Sly ]it ��L [N <br /> 114 - 1 -Q <br /> - ... <br /> ❑ ❑ ��� uj <br /> ati <br /> k <br /> ::3 ', , • IFS - <br /> Z <br /> = U <br /> � fn <br /> ..................................... <br /> ., W LLLf <br /> L' Z <br /> W O <br /> < g <br /> : <br /> I <br /> w <br /> REVISIONS, <br /> f ! iUn, <br /> 2 <br /> ii <br /> Uwl <br /> - 10 <br /> Iojo Inds <br /> s <br /> EQ-1 ❑ <br /> 1 3 . 4 EQ-9 <br /> EQ-4 EQ-5 EQ-7 EQ-8 2 <br /> . ................ .............' <br /> ° CHECKED BY: Checker <br /> ci GFci ISSUE DATE: 5 NOV 2018 <br /> �: PROJECT IVC: 2018004 <br /> \L„, <br /> U <br /> a <br /> ELECTRICAL & w <br /> 77 <br /> POWER PLAN <br /> PLUMBING [PLAN in <br /> r <br /> 1 <br /> 114” = 1'-0" <br /> I <br /> A2mlO Lr:� ' <br /> r <br /> i' <br /> E. <br /> I' <br />