Laserfiche WebLink
1534 Willow Pass Road,Pittsburg,CA 94565-1701 <br /> M c C a m p b e I l Analytical, Inc. Toll Free Telephone:(877)252-9262/Fax:(925)252-9269 <br /> .t "When Quality Counts" http://www.mccampbell.coin/E-mail:main(a)mccampbell.com <br /> WORK ORDER SUMMARY <br /> Client Name: GOLDSMITH CONSTRUCTION Project: Bore Job for Yara Work Order: 1909532 <br /> Client Contact: Jose Cisneros QC Level: LEVEL 2 <br /> Contact's Email: j.cisneros@goldsmitheorp.net Comments: Date Logged: 9/12/2019 <br /> WaterTrax ❑WriteOn ❑EDF ❑Excel ❑EQuIS ❑Email E]HardCopy ❑ThirdParty ❑J-flag <br /> Lab ID Client ID Matrix Test Name Containers Bottle&Preservative De- Collection Date "TAT Sediment Hold SubOut <br /> /Composites chlorinated &Time Content <br /> 1909532-001 A Bore Pit Auger Soil Multi-Range TPH I 160Z GJ,Unpres ❑ 9/12/2019 8:01 1 day El <br /> 1909532-002A Hole sample Soil Multi-Range TPH 1 160Z GJ,Unpres ❑ 9/12/2019 825 1 day 0 <br /> NOTES: -STLC and TCLP extractions require 2 days to complete; therefore, all TATs begin after the extraction is completed (i.e., One-day TAT yields results <br /> in 3 days from sample submission). <br /> -MAI assumes that all material present in the provided sampling container is considered part of the sample -MAI does not exclude any material from <br /> the sample prior to sample preparation unless requested in writing by the client. <br /> Page 1 of 1 <br /> Page 9 of 1 I <br />