Laserfiche WebLink
Groundwater Field Sampling Form Page2of <br /> Client: Kearney-KPF Facility 10886-1 Date: <br /> Project Name: Q2 2018 GW Monitoring and Sampling Event <br /> Well ID: <br /> Field Crew: Claire Kouba <br /> Well Type: Monitor Extraction Injection Ot' <br /> Marcelo Azevedo <br /> GROUNDWATER PARAMETER MEASUREMENTS(Continued) T <br /> Conductivity DO Turbidity <br /> Time Gallons pH Temp.(C) (gS/cm= (mg/L (NTU) Color/Odor DTW <br /> imho/cm Z <br /> End of Purge <br /> Pump off <br /> Recovery <br /> Comments/Sampling: <br /> Stabilization Criteria <br /> PH+/-0.1 <br /> Tem erature+/-3% <br /> SC+/-3% <br /> DO+/-0.3 m /L <br /> ORP+/- 10 mV <br /> Turbidity +/- 10% <br />