Laserfiche WebLink
p � b <br /> 'RUNTY OF SAN JOAa1N THOMAS R. FLINN <br /> DEPUTY DIRECTOR <br /> DEPARTMENT OF PUBLIC WORKS <br /> P.Q. BOX 1810- 1810 E. HAZELTON AVENUE <br /> ��tiRc�it'�a STOCKTQN, CALIFORNIA 95201 STEVEN WINKLER <br /> 1209] 468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209) 468-2999 <br /> DIRECTOR <br /> June 1, 2000 <br /> E„ 'F---1 V E <br /> MEMORANDUM <br /> JUN -. 5 2000 <br /> TO: Kerry Sullivan, Deputy Director <br /> Community Development Department x,0;1 munh' j, evelcoiient Dept. <br /> CONTACT PERSON: Tina Wehrmeister <br /> FROM: Ben Neely, Engineer II -;Sep <br /> Public Services Division <br /> SUBJECT: LA-00-42 A LOT LINE ADJUSTMENT APPLICATION TO ADJUST <br /> LOT LINES BETWEEN TWO PARCELS. PARCEL ONE TO <br /> CONTAIN 4,000 SQUARE FEET, PARCEL TWO TO CONTAIN <br /> 4,500 SQUARE FEET, LOCATED ON THE NORTHWEST CORNER OF <br /> GOLDEN GATE AVENUE AND CHARLES STREET. (DISTRICT 1). <br /> APPLICANT: Adam Eigenberger APNs: 143-130-20 and <br /> 143-130-21 <br /> INFORMATION: <br /> Golden Gate Avenue has an existing right-of-way width of 33.75 feet and a planned right-of-way <br /> width of 50 feet. Charles Street has an existing right-of-way width of 40 feet and a planned <br /> right-of-way width of 50 feet. <br /> RECOMMENDATIONS: <br /> 1. A Recorded Deed is allowed, but if points or lines are set, a Record of Survey is required. <br /> (New legal description shall be submitted to Surveyor's office for review.) <br /> (Development Title Section 9-872.4) <br /> 2. New description must reflect correct distance with qualifiers to avoid overlap or gap. <br /> 3. This development is subject to reapportionment under the San Joaquin Area Flood <br /> control Agency Assessment District No. 96-1 (Flood Protection Restoration Project). An <br /> application requesting the reapportionment of the unpaid portion of the assessment, along <br /> with the payment of the reapportionment fee, shall be provided prior to recording the <br /> Notice of Lot Line Adjustment. <br /> 4. This development is subject to assessments under Improvement District No. 51. <br /> The subdivider shall initiate processing of Segregation of Services. Currently,the <br /> fee for processing the segregation is $250 plus $15 per lot,per Development Title <br /> Section 9-240.2 and Resolution R-91-327. <br /> (Development Title Section 9-1105.3) <br /> RWH.BN:mr <br /> P&DEM-Ml <br /> E: Manuel Lopez, Director of Public Works <br />