Laserfiche WebLink
J <br /> p4U,IN <br /> COUNTY OF SAN JOAQUIN <br /> z •^ �'?, THOMAS R. FLINN <br /> DEPARTMENT OF PUBLIC WORKS DEPUTYDIRECTOR <br /> P.O.BOX 1810-1810 E.HAZELTON AVENUE <br /> °q(IFORtP STOCKTON,CALIFORNIA 95201 THOMAS M.GAU <br /> (209)468-3000 DEPUTY DIRECTOR <br /> MANUEL LOPEZ FAX(209)468-2999 <br /> DIRECTOR <br /> STEVEN WINKLER <br /> DEPUTY DIRECTOR <br /> October 15, 2001 <br /> MEMORANDUM CEII%f��j <br /> TO: Kerry Sullivan, Deputy Director OCT 17 2001 <br /> Community Development Department <br /> CONTACT PERSON: Jennifer Jolley mmunity Development Dept. <br /> 1 EW PICC-L,% <br /> FROM: Gabriel Karam, Senior Civil Engineer <br /> Public Services Division <br /> SUBJECT: SA-01-70A SITE APPROVAL APPLIC ON FOR EXPANSION OF <br /> EXISTING ROAD OIL SALES AND S ADING BUSINESS. BUILDINGS <br /> TO BE BUILT IN TWO PHASES. P SE ONE TO CONSTRUCT A 9,600 <br /> SQUARE FOOT WAREHOUSE A 6,000 SQUARE FOOT OPEN <br /> SHED. PHASE TWO A 3,200 S ARE FOOT OFFICE BUILDING AND A <br /> 6,000 SQUARE FOOT WARE USE, LOCATED ON THE SOUTH EAST <br /> CORNER OF MINER AVE AND GOLDEN GATE AVENUE. <br /> (SUPERVISORIAL DIS T 1) <br /> APPLICANT: Kent Raverty APN: 143-390-02, 143-390-03, 143-390-04 <br /> and 143-390-05 <br /> INFORMATION: <br /> The site is not currently located a Federal Flood Insurance Administration Designated <br /> Flood Hazard Area. In addition, a existing San Joaquin County and City of Stockton Flood <br /> Insurance Studies , which deli ate flood risks, floodplains and floodway areas,are currently <br /> being reevaluated. The reev tion is being conducted by the Federal Emergency Management <br /> Agency, Region IX, Buildin 105, Presidio of San Francisco, California 94129-1250,telephone <br /> (415)923-7186. The reev tion may delineate additional flood risks. The official flood maps <br /> are available for review a e Department of Public Works, 1810 East Hazelton Avenue, <br /> Stockton. These flood ps will be updated when the reevaluation process is completed. <br /> Miner Avenue has an xisting right-of-way width of 40 feet and a planned right-of-way width of <br /> 50 feet. Golden Gat Avenue has an existing right-of-way width of 40 feet and a planned right- <br /> of-way width of 5 eet. <br /> RECOMME ATIONS: <br /> 1. An e roachment permit shall be required for work within road right-of-way. <br /> (De elopment Title Sections 9-1145.4 and 9-1145.5) <br /> 2. a driveway approach shall be improved in accordance with the requirements of <br />