My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SU0004412
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
G
>
GOLDEN GATE
>
232
>
2600 - Land Use Program
>
SA-01-70
>
SU0004412
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
5/7/2020 11:30:46 AM
Creation date
9/18/2019 9:20:04 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2600 - Land Use Program
RECORD_ID
SU0004412
PE
2632
FACILITY_NAME
SA-01-70
STREET_NUMBER
232
Direction
N
STREET_NAME
GOLDEN GATE
STREET_TYPE
AVE
City
STOCKTON
ENTERED_DATE
5/19/2004 12:00:00 AM
SITE_LOCATION
232 N GOLDEN GATE AVE
RECEIVED_DATE
9/20/2001 12:00:00 AM
QC Status
Approved
Scanner
SJGOV\rtan
Supplemental fields
FilePath
\MIGRATIONS4\G\GOLDEN GATE\232\SA-01-70\SU0004412\EH COND.PDF \MIGRATIONS4\G\GOLDEN GATE\232\SA-01-70\SU0004412\APPL.PDF \MIGRATIONS4\G\GOLDEN GATE\232\SA-01-70\SU0004412\CDD OK.PDF \MIGRATIONS4\G\GOLDEN GATE\232\SA-01-70\SU0004412\PUB REC REL APPL.PDF
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
39
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Kerry Sullivan -2- <br /> COMMENTS ON DEVELOPMENTS <br /> SA-01-70 <br /> (Development Title Section 9-1145.5) <br /> 3. The Traffic Impact Mitigation Fee may be required for this develop nt. The fee is due <br /> and payable at the time of building pernut application. (The fee c ently is $680.00 per <br /> 1,000 gross square foot of building designated as Manufacturi . The fee shall be <br /> automatically adjusted July 1 of each year by the Engineerm onstruction Cost Index a <br /> published by the Engineering News Record. A credit ma a allowed if it can be verifi <br /> that the existing development on this site was in operati on or after April 23, 1990 <br /> (Resolutions 00-433) <br /> 4. The Water Supply Facilities Impact Mitigation F may be required for this de lopment. <br /> The fee is due and payable prior to issuance of a building permit. (The fee urrently is <br /> $184.00 per 1,000 gross square foot of buildi g designated as Manufactu ' g. The fee <br /> shall be automatically increased on January of each year through the y 2005 at the rate <br /> of 7.66 percent. A credit may be allowe f it can be verified that the sting development <br /> on this site was in operation on or after pril 30, 1991.) <br /> (Development Title Section 9-818.4 d Resolutions R-91-327, R- 4-185 and R-97-5) <br /> 5. A copy of the Final Site Plan shall a submitted prior to releas9l/of building permit. <br /> 6. Verification shall be obtained f in the Solid Waste Divisio (468-3066)that this <br /> development has met the req 'rements of the Waste Plan ormat for Development <br /> Projects. Final Site Plan is quired upon submittal of v 'fication. <br /> 7. The owner shall execute n Irrevocable Offer and A eement to Dedicate Road to result in <br /> in a fifty(50) foot wid 'ght-of--way from the cent line of Miner Road to the property line <br /> across parcels numb ed 143-390-04, 143-390-0 , and a fifty foot right-of-way from the <br /> centerline of Golde Gate Avenue to the prope line across parcel number 143-390-01 <br /> frontages. A $28 .00 fee currently is required or processing per Development Title Table <br /> 9-240.2 In addit n to a copy of the Grant Died and a legal description of the parcel to be <br /> offered for de cation.) (The fee due will be based on the current fee schedule.) <br /> (Developme Title Section 9-1150.5) <br />
The URL can be used to link to this page
Your browser does not support the video tag.