My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
COMPLIANCE INFO
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
S
>
STEWART
>
2250
>
1900 - Hazardous Materials Program
>
PR0520818
>
COMPLIANCE INFO
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
11/22/2019 8:12:09 AM
Creation date
9/18/2019 2:21:02 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
1900 - Hazardous Materials Program
File Section
COMPLIANCE INFO
RECORD_ID
PR0520818
PE
1921
FACILITY_ID
FA0012409
FACILITY_NAME
AZCO SUPPLY INC
STREET_NUMBER
2250
STREET_NAME
STEWART
STREET_TYPE
ST
City
STOCKTON
Zip
95205
APN
11908022
CURRENT_STATUS
01
SITE_LOCATION
2250 STEWART ST # 9
P_LOCATION
01
QC Status
Approved
Scanner
FRuiz
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
31
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
The following is an itemized list of hazardous materials violations that have not been <br /> addressed for AZCO SUPPLY INC as of November12, 2019. <br /> Open violations from September 17, 2019 inspection <br /> Violation #11 - Failed to provide or document initial and/or refresher training to appropriate personnel. <br /> Documentation showing initial and annual refresher training of the following elements was not available at the time <br /> of inspection: <br /> 1. Familiarity with the emergency response plans and procedures in the event of a release or threatened release <br /> of a hazardous material; (Emergency Response/Contingency Plan familiarization). <br /> 2. Immediate notification contacts to the appropriate local emergency response personnel and to the unified <br /> program agency; (spill reporting). <br /> 3. Procedures for the mitigation of a release or threatened release to minimize any potential harm or damage to <br /> persons, property, or the environment; (spill response). <br /> 4. Evacuation plans and procedures, including immediate notice, for the business site; (evacuation training). <br /> The business plan shall include provisions for ensuring that appropriate personnel receive initial and annual <br /> refresher training. This training shall be documented electronically or by hard copy and shall be made available for <br /> a minimum of three years. Immediately provide employee training for appropriate personnel and submit a copy of <br /> the training records to the EHD. <br /> ❑ This violation was corrected ❑ This violation will be corrected by (date): <br /> ❑ Supporting documents included <br /> Describe actions taken or will be taken to correct violation: <br /> Page 2 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.