Laserfiche WebLink
CIWMB 501 (Rev. 9/02) <br /> OPERATION PLAN <br /> Page 5 of 5 <br /> IV. INDOOR STORAGE <br /> INDOOR STORAGE REQUIREMENTS-§17356 <br /> ❑ Meets NFPA 231 D Standards(attach verification) <br /> ❑ Alternative standards approved by the local fire authority(attach approval) <br /> V. MAP REQUIREMENTS (Minor facilities provide items a and b,Major facilities provide items a through f): <br /> a. General area location,with additional larger scale if needed to show proximity to nearest town, city, or major highway. <br /> b. Plot plan of site,drawn to scale,which shows: <br /> I. Legal boundaries for which title or leasehold is held(attach copy of lease agreement for property,if applicable); <br /> 2. All buildings or structures on-site, indicating use;all other structures within 200 feet of site boundary; <br /> 3. Site access including road or street names; <br /> 4. Location of fences,gates, and other access control measures; and <br /> 5. Dimensions of existing and planned tire storage units, fire lanes, fire breaks. <br /> C. Site topography, including: <br /> I. Drainage swales, ditches, berms,surface waters,wetlands, 100 year floodplain boundary, and other drainage.features; <br /> 2. Wooded areas; and <br /> 3. Other appropriate physical features. <br /> d. Loading, unloading, salvage, and processing areas. <br /> e. Locations of fire hydrants or wells for fire fighting water supply; indicate flow capacities of hydrants, mains, and wells. <br /> f Site surface material, e.g.,asphalt,gravel,compacted earth, etc. <br /> VI. OPERATOR CERTIFICATION <br /> 1 certify,that this document and all attachments were prepared under my direction or supervision. l have inquired of the persons <br /> directly,responsible for gathering the information, and certify that the information submitted is, to the best of my knowledge and <br /> belief, true, accurate and complete. <br /> Operator Signature: <br /> Typed Name&Title: Date: <br />