Laserfiche WebLink
Comments: <br /> Routine inspection on this date and the following was noted: <br /> No violations or areas of concern. <br /> Notes: <br /> 1.)TPID certificate is posted in the office. <br /> 2.) Manifests from "Bridgestone Americas Tire Operations, LLC" (GCR, BATO)were available for review. <br /> 3.)5 CTLs onsite had load dates that differed from information in the WTMS: <br /> CTL# Onsite WTMS 5607188-A 6/30/16 7/1/16 5607155-A 4/1/16 4/5/16 5254945-A 11/23/15 12/1/15 <br /> 5200518-A 9/2/15 9/3/15 5200542-A 7/7/15 7/9/15 <br /> 4.) Lucky Singh (owner)granted permission to conduct the inspection. <br /> 5.) Retain all waste tire manifests, disposal receipts, and logs for 3 years. <br /> 6.) Facility only stores it's waste tires at this location. <br />