My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
SECTION 2.0:PROJECT DESCRIPTION <br /> 2.4.1.4.1 Onsite Fire Protection Systems <br /> The fire protection systems are designed to protect personnel and limit property loss and <br /> plant downtime from fire or explosion. The project will have the following fire protection <br /> systems. <br /> Carbon Dioxide and Dry Chemical Fire Protection Systems <br /> These systems protect the combustion turbines and certain accessory equipment <br /> compartments from fire. The system will have fire detection sensors in all protected <br /> compartments. Actuating one sensor will provide a high-temperature alarm on the <br /> combustion turbine control panel. Actuating a second sensor will trip the combustion <br /> turbine,turn off ventilation,close ventilation openings, and automatically release the gas <br /> and chemical agents. The gas and chemical agents will be discharged at a design <br /> concentration adequate to extinguish the fire. <br /> Fire Hydrants/Hose Stations <br /> This system will supplement the plant's fixed fire suppression systems. Water will be <br /> supplied from the plant fire water system. <br /> Fire Extinguisher <br /> The plant administrative/control/warehouse/maintenance building,water treatment <br /> building, and other structures will be equipped with fixed fire suppression systems and <br /> portable fire extinguishers as required by the local fire department. <br /> 2.4.1.4.2 Local Fire Protection Services <br /> In the event of a major fire,the plant personnel will be able to call upon the San Joaquin <br /> County Woodbridge Fire District for assistance.The Hazardous Materials Business Plan(see <br /> Section 5.5,Hazardous Materials Handling) for the plant will include all information <br /> necessary to allow fire-fighting and other emergency response agencies to plan and <br /> implement safe responses to fires, spills, and other emergencies. <br /> 2.4.1.5 Personnel Safety Program <br /> The LEC project will operate in compliance with federal and state occupational safety and <br /> health program requirements. Compliance with these programs will minimize project <br /> effects on employee safety. These programs are described in Section 5.16,Worker Health <br /> and Safety. <br /> 2.5 Facility Reliability <br /> This section discusses the expected facility availability, equipment redundancy,fuel <br /> availability,water availability, and project quality control measures. <br /> 2.5.1 Facility Availability <br /> The LEC facility will be designed to operate between about 50 and 100 percent of base load <br /> to support dispatch service in response to customer demands for electricity. The plant will <br /> be designed for an operating life of 30 years. Reliability and availability projections are <br /> based on this operating life. Operation and maintenance procedures will be consistent with <br /> industry standard practices to maintain the useful life status of plant components. <br /> 2-36 SAC/371322/082340003(LEC_2.0_PROJECT_DESC.DOC) <br />
The URL can be used to link to this page
Your browser does not support the video tag.