Laserfiche WebLink
® WorleyParsons <br /> resources&energy <br /> Specific Minimum Redundancy Requirements for Equipment: <br /> COMPONENT NUMBER OF COMPONENTS REQUIRED <br /> Steam Jet Air Ejectors 1x100% Hogger 2x100% Holding Trains <br /> Ammonia Tanks N/A <br /> Ammonia Forwarding Pumps 1 <br /> Auxiliary Boiler and Feed Pump 1 x 100% <br /> Boiler Feedwater Pumps 2 x 100% (based on non-duct fired <br /> performance) <br /> Closed Cooling Water Pumps 2 x 100% <br /> Closed Cooling Water Heat Exchangers 2 x 100% <br /> Condensate Pumps 3 x 50% <br /> Circulating Water Pumps 3 x 50% <br /> Demineralized Water Pumps 3 x 50% <br /> Dew Point Heater(if required) 1 x 100% <br /> Primary Fuel Gas Scrubber/Filter- 1 x 100% <br /> Separator/Drains Tank Skids <br /> Final Performance Heater/KO Drum Skid <br /> b OEM if required) 1 x 100% per CTG <br /> Filter-Separator Skids (main and pilot filters) 2 x 50% (main)/CTG <br /> (by OEM) 2 x 50% (pilot)/CTG <br /> Diesel Fire Pump N/A <br /> Electric Fire Pump N/A <br /> Jockey Fire Pump N/A <br /> Air Compressors/Dryers 2 x 100% <br /> Service Water Pumps 3 x 50% <br /> Oil/Water Separator 1 x 100% <br /> Sump Pumps 1 x 100% Per Sump <br /> CTG Lubricating Oil Pumps (AC) 2 x 100% (Part of OEM Package) <br /> Lodi Energy Center 3.1 -3 LEC AFC <br /> 071708 Rev.A <br />