Laserfiche WebLink
® WorleyParsons <br /> resources&energy <br /> OSHA guidelines and general industrial practice. Identification for all exits and fire <br /> protection equipment will also be provided. Traffic marking and signs will be provided as <br /> necessary to assure proper traffic flow, control and safety. All requirements of the Fire <br /> Marshall having jurisdiction will be followed. <br /> 2.6 Testing <br /> The services of an independent qualified materials testing laboratory will be engaged to <br /> sample, test and certify that the following construction work and materials are installed as <br /> specified: <br /> - Earthwork materials and compaction <br /> - Asphalt paving compaction <br /> - Concrete slump <br /> - Concrete strength <br /> - Concrete air entrainment <br /> - Grout strength. <br /> - Masonry Grout&Mortar <br /> - Structural Steel Installation <br /> Lodi Energy Center 3.2- 14 LEC AFC <br /> 071608 Rev.A <br />