My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® WorleyParsons <br /> resources&energy <br /> Boiler feedwater pumps will provide feedwater consistent with the HRSG design <br /> conditions as stipulated in ASME, Section I, Power Boilers, paragraph PG-61. Where <br /> there is an intermediate pressure level in the steam generator, and the flow rate of the <br /> intermediate level is less than approximately a third of the high-pressure section, the <br /> boiler feedwater pump will include an interstage bleed. The interstage bleed will allow a <br /> single pump to feed the high pressure as well as the intermediate pressure levels of the <br /> HRSG. Where the flow rate of the intermediate level is more than a third of the high- <br /> pressure level, separate boiler feed pumps will be provided for the required pressure <br /> levels of the HRSG. <br /> An interstage bleed type of pump will be provided with one recirculation valve installed <br /> on the high-pressure section. Minimum flow measurement will be taken from the high- <br /> pressure feedwater flow element. Recirculation flow will be directed to the low-pressure <br /> drum. No recirculation valve is required from the bleed section of a pump. <br /> The boiler feedwater pump will be equipped with a "T-type" suction strainer (with at <br /> least 4 x pipe area) consisting of a 120 mesh enclosed by a permanent 80 mesh strainer. <br /> Each boiler feedwater pump will be provided with its own, closed lubrication system. <br /> Pump start up will require lubrication system start up before the pump is allowed to <br /> start. Pump shaft seals will be mechanical, designed for the proper temperature. <br /> Vibration Probes - Vibration probes will be Bently Nevada Series 3300XL proximity <br /> probes. <br /> Vibration Monitoring System - A separately mounted vibration monitor system will be <br /> provided to monitor the boiler feed pump and motor probes. Vibration monitors will be <br /> Bently Nevada Series 3500 and one vibration monitor will be provided for each set of <br /> two motor/pump sets. <br /> DCS Alarm and Tripping - 4-20mA signals from the 3500/42M proximitor monitors for <br /> each boiler feed pump will be wired to the balance of plant DCS system for indication, <br /> alarming, and tripping. <br /> Each HRSG will have two 100%boiler feed (very high flow operating cases will require <br /> dual pump operation).). The boiler feed pumps will be electrically driven, multistage, <br /> centrifugal pumps with the following: <br /> • Heavy-duty baseplate for all components and accessories. <br /> • Sleeve bearings and Kingsbury-type thrust bearings with forced oil lubrication. <br /> • 400 series stainless steel shafts and chromoly cases (API 610 Table H-1 C-6). <br /> • The pump system will include the following instrumentation: <br /> o Discharge Pressure <br /> o Discharge Temperature <br /> o Bearing Temperature <br /> Lodi Energy Center 3.3 - 15 LEC AFC <br /> 071508 Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.