My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® WorleyParsons <br /> resources&energy <br /> 3.18.2 Lagging Materials and Installation <br /> All insulated surfaces of equipment, ductwork, piping, and valves will be lagged, <br /> except where removable covers are used. <br /> 3.18.3 Freeze Protection <br /> All above ground piping smaller than 2-inch nominal diameter and subject to <br /> freezing will be insulated and provided with electric heat tracing. In addition, all <br /> piping will be evaluated for freeze protection by the following methods: Insulation, <br /> electric heat tracing, low point drains, high point vents and schedule 80 piping. <br /> 3.19 Lubrication <br /> Types of lubrication specified for facility equipment will be suited to the operating <br /> conditions and will comply with the recommendations of equipment manufacturers. <br /> The startup charge of flushing oil will be the manufacturer's standard lubricant for <br /> the intended service. Subsequently, such flushing oil will be sampled and analyzed <br /> to determine whether it can also be used for normal operation or must be replaced in <br /> accordance with the equipment supplier's recommendations. <br /> Rotating equipment will be splash lubricated, force lubricated, or self-lubricated. <br /> Oil cups will be provided as necessary. Where automatic lubricators are fitted to <br /> equipment, provision for emergency hand lubrication will also be specified. Where <br /> applicable, equipment will be designed to be manually lubricated while in operation <br /> without the removal of protective guards. Lubrication filling and drain points will <br /> be readily accessible. <br /> Lodi Energy Center 3.3 -25 LEC AFC <br /> 071508 Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.