My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® WorleyParsons <br /> resources&energy <br /> in the neutral circuit to aid in identifying ground faults. <br /> Accessories will include a magnetic liquid-level gauge, pressure-relief device, sudden <br /> pressure relay, oil preservation device, valves for top and bottom filter press connections, <br /> drain/sampling valves, grounding pads, bushing-mounted current transformers, and hot <br /> spot winding temperature elements. <br /> The SUS transformers will include a manual de-energized tap changer located in the HV <br /> winding with taps ranging from 5 percent above normal to 5 percent below normal in 2.5 <br /> percent increments. <br /> 4.9 Power Distribution Centers (PDC) <br /> Power Distribution Centers (PDC) will house all 4.16kV switchgear and motor control <br /> centers, 480V voltage switchgear, low voltage MCCs, DCS panels, power and lighting <br /> panels, revenue metering, protective relaying, station batteries, CAISO RIG and other <br /> miscellaneous equipment. <br /> Each PDC will be equipped with redundant HVAC systems, smoke detection and lighting <br /> & convenience receptacles. Each electrical equipment area will be equipped with a wall <br /> mounted maintenance switch. This switch will be placed in the "maintenance" position <br /> whenever the switchgear area is occupied. When operated, this switch will remove all time <br /> delays in the main protective relays thereby making them essentially instantaneous trip <br /> relays. This action has the effect of lowering the arc flash hazard to a safe level as defined <br /> by NFPA 70E. <br /> The PDC will be shipped to site with all wiring completed between all internal <br /> components. <br /> 4.10 Medium Voltage Switchgear <br /> Two lineups of medium voltage switchgear will be provided. This switchgear will be 15kV <br /> class nominal, three-phase, three-wire with ratings not to exceed 3000A continuous and <br /> 50kA fault current duty. The medium voltage system will be high-resistance grounded via <br /> the CTG neutral grounding transformer when the generator breaker is closed, and will be <br /> ungrounded when the generator breaker is open. A set of zero-sequence PT's and ground <br /> fault protection are required for each MV switchgear bus to monitor for bus ground faults <br /> prior to closing the generator breaker. <br /> The medium voltage switchgear will be located indoors, will use vacuum interrupters, and <br /> will be rated to continuously distribute the full auxiliary load. Each lineup will contain <br /> voltage transformers, protective relaying for the GSUT, UAT, and feeder breakers and <br /> other load distribution equipment. All medium voltage breakers will be electrically <br /> operated from the DCS and equipped with a stored energy mechanism. <br /> Lodi Energy Center 3.4-5 LEC AFC <br /> 071608 Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.