My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® WorleyParsons <br /> resources&energy <br /> • 480 V motors fed from MCCs <br /> — Thermal overload and motor circuit protector <br /> • Panels, transformers, heaters and miscellaneous loads fed from MCCs <br /> — Thermal-magnetic molded-case circuit breaker <br /> 4.16 Metering <br /> 4.16.1 Metering- General <br /> Metering class CT's & PT's will be provided in the generator breaker associated with each <br /> CTG. Space for the revenue metering should be provided in the PDC, but may be approved <br /> for outdoor installation if approved by CAISO and PG&E revenue metering <br /> representatives. <br /> Metering of plant auxiliary power during standby will be provided by a PG&E revenue <br /> metering installation on the 18kV-4.16kV transformer. This revenue meter installation will <br /> be configured to monitor auxiliary power consumption when both generator breakers are <br /> open and the plant is in a standby mode. This meter will be enabled when both generator <br /> breakers are open and disabled if either one or both of the generator breakers are closed. <br /> The final aux electric metering configuration, metering instrument transformers and test <br /> switches will must be reviewed and approved by the local utility prior to installation. <br /> Relaying class accuracy voltage and current transformers are acceptable for panel <br /> indication meter applications. <br /> Test switches will be provided for the voltage and current inputs to each meter. <br /> 4.16.2 Metering Locations <br /> Indication metering will be provided in the following locations: <br /> • Each generator(voltage, current, kW, WAR, kWHr, kVARHr, pf, and freq) <br /> • Each 18kV breaker (voltage, current, kW, and WAR) <br /> • The 4.16kV main breaker (voltage, current, kW, and WAR <br /> • Each low voltage main breaker(voltage, current, kW, and WAR <br /> • Each medium voltage motor(current)—provided motor protection relays <br /> • Low-voltage motor control centers (voltage, current, kW, and WAR <br /> • 125 VDC BOP systems: <br /> — Battery amperes (at DC switchboard) <br /> — Bus voltage (at DC switchboard) <br /> — Negative to ground(at DC switchboard) <br /> — Positive to ground(at DC switchboard) <br /> Lodi Energy Center 3.4- 10 LEC AFC <br /> 071608 Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.