My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® WorleyParsons <br /> resources&energy <br /> • Transformer temperature (4-20mA) <br /> Each 4.16kV-480V Transformer: <br /> • Common trouble alarm(DI) <br /> Each Medium Voltage Switchgear Lineup: <br /> • Bus voltage (through datalink) <br /> • Main breaker current, kW, and WAR(through datalink) <br /> • Transformer and MCC feeders current, kW, and WAR(through datalink) <br /> • Motor feeders current(through datalink) <br /> • Bus undervoltage indication(DI) <br /> • Instrument voltage transformer blown fuse indication (through datalink) <br /> • I/O as defined on standard schematics <br /> Each 480V Switchgear: <br /> • Ground fault alarm <br /> • Bus phase A-to-B voltage (4-20mA) <br /> • Main breaker phase B current(4-20mA) <br /> 125VDC System: <br /> • One common trouble alarm from each battery charger <br /> • One common trouble alarm from each 125VDC switchboard <br /> • One common alarm from each battery management system <br /> 120VAC UPS System: <br /> • One common trouble alarm from the UPS inverter <br /> • Position of each main breaker/switch on each UPS panelboard <br /> • Manual bypass switch position <br /> 4.18 Controls <br /> 4.18.1 Synchronizing <br /> The CTG and STG will be synchronized automatically from the balance of plant DCS <br /> through the units respective synchronizing system, which is included as part of each <br /> generator package. In addition, the CTG will also be complete with vendor supplied <br /> controls to allow the CTG to be synchronized from the local CTG control room. The <br /> synchronizing system will control turbine speed/generator frequency, generator voltage, <br /> and breaker closure (factoring in breaker historical closure time). No remote manual <br /> synchronizing capability is required. Synchronizing breaker selection will be performed <br /> Lodi Energy Center 3.4- 12 LEC AFC <br /> 071608 Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.