My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Ed Warner <br /> July 16, 2008 <br /> Page 4 <br /> Due to the high capital cost of this gas service when compared to the revenue <br /> generated PG&E reserves the right to request that this service be provided under <br /> a special agreement as provided in PG&E's Gas Rule 15.H.3 and 16.H.3 <br /> Exceptional Cases. PG&E and Applicant would negotiate this special agreement <br /> and submit the agreement to the California Public Utilities Commission for <br /> approval. <br /> Applicant's order-of-magnitude costs follow. Costs are based upon 2008 <br /> estimates and not escalated for inflation. <br /> Total Estimated Cost for Standard Facilities Design at Costs +/- 50% <br /> Prevailing Service Delivery Pressure <br /> Tap existing pipeline system $ 75,000 <br /> Install -2.1 miles of 6" steel pipe $ 2,200,000 <br /> Install -100' of 6" Service $ 20,000 <br /> Install 16" Ultrasonic Meter Set $ 680,000 <br /> Subtotal: $ 2,975,000 <br /> Income Tax Contribution to Construction 35% of subtotal $ 1,041,000 <br /> Total Standard Facilities Costs $ 4,016,000 <br /> These costs do not include allowances, if any. Should Applicant request a <br /> Special Facilities Design, a Special Facilities contract would be required which is <br /> in addition to the costs identified above. <br /> Total Estimated Cost for Special Facilities Design at Costs +/- <br /> Elevated Service Delivery Pressure -240 psig 50% <br /> Incremental costs for Special Facilities Design $1 ,260,000 <br /> Income Tax Contribution to Construction ITCC : $441,000 <br /> Cost of Service, Customer Financed Option $990,000 <br /> Total Costs for Special Facilities: $2,691,000 <br /> Or <br /> Total Estimated Cost for Special Facilities Design at Costs +/- <br /> Elevated Service Delivery Pressure-360 psig 50% <br /> Incremental costs for Special Facilities Design $5,095,000 <br /> Income Tax Contribution to Construction ITCC : $1,783,000 <br /> Cost of Service, Customer Financed Option $4,002,000 <br /> Total Costs for Special Facilities: $10,880,000 <br /> Or <br />
The URL can be used to link to this page
Your browser does not support the video tag.