Laserfiche WebLink
Mr. Ed Warner <br /> July 16, 2008 <br /> Page 6 <br /> The cash advance is to proceed with the engineering required to develop the <br /> project to a point where PG&E can proceed with construction, and may not include <br /> ordering long lead-time material. Should the cash advance not cover costs required <br /> to develop a final job estimate and contract, or the ordering of long lead time <br /> material, PG&E will need to request a further cash advance to cover such costs. <br /> Should the project not proceed, Applicant should notify PG&E to stop work, and <br /> PG&E would return any unspent balance. The final costs and work schedule for <br /> this phase will be determined as PG&E proceeds with detailed engineering and <br /> land work. <br /> The cash advance should be made out to Pacific Gas and Electric at: <br /> Pacific Gas and Electric Company <br /> Attn: Rod Boschee <br /> 245 Market Street, Room 1553 <br /> San Francisco, CA 94105-1702 <br /> If you have any questions about this information, please call Mike O'Brien at 415- <br /> 973-5652. <br /> Sincerely, I (� <br /> io,cney Boschee <br /> Manager, Business Development <br />