My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Page 1 of 1 <br /> To: Ed Warner <br /> Subject: RE: Lodi Energy Center Facilities Study Agreement- Executed -Milestone Dates <br /> From: Fishback, Edward [mailto:EFishback@caiso.com] <br /> Sent: Wednesday, August 06, 2008 3:06 PM <br /> To: Ed Warner; Madrid, Barbara; RJLz@pge.com; Shah, Nisar; Liu, Nan <br /> Cc: Chen,Kaicheng; Wright, Linda <br /> Subject: FW: Lodi Energy Center Facilities Study Agreement - Executed - Milestone Dates <br /> The ISO received the executed Lodi Energy Center Interconnection Facilities Study Agreement <br /> (IFASA) and required deposit on Tuesday August 5, 2008. <br /> LGIP requires PG&E and CAISO to complete the draft Interconnection Facilities Study (IFS) report and <br /> deliver it to NCPA by December 3, 2008 <br /> Modified milestone dates: <br /> In order to comply with the recent CAISO Generation Interconnection Process Reform (GIPR) filling <br /> with FERC, PG&E will provide a draft IFAS report to CAISO by October 3, 2008. CAISO will review, <br /> update, and issue the draft report to NCPA for comments within 7 calendar days (CD) after receipt from <br /> PG&E. NCPA is requested to provide comments within 7 CD after receipt of the draft report. The final <br /> report will be issued within 7 CD after receiving comments from the IC. <br /> Ed Fishback <br /> Project Manager <br /> California ISO <br /> 151 Blue Ravine Road <br /> Folsom, CA 95630 <br /> Phone (916) 608-5836 <br /> Cell (916) 802-6401 <br /> Fax (916) 351-2264 <br /> X4470 <br /> file://\\yosemite\PROJ\NCPA\371322\Draft_AFC\Volume_2\Appendix_3\RE Lodi Energ... 8/26/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.