Laserfiche WebLink
INTERCONNECTION FACILITIES STUDY AGREEMENT <br /> LODI ENERGY CENTER <br /> 3.0 The scope of the Interconnection Facilities Study shall be subject to the <br /> assumptions set forth in Attachment A and the data provided in <br /> Attachment B to this Agreement. <br /> 4.0 The Interconnection Facilities Study report (i) shall provide a description, <br /> estimated cost, including, if applicable, the cost of remedial measures that <br /> address the financial impacts, if any, on Local Furnishing Bonds, of <br /> (consistent with Attachment A), and schedule for required facilities or for <br /> effecting remedial measures that address the financial impacts, if any, on <br /> Local Furnishing Bonds within each Participating TO's electric system to <br /> interconnect the Large Generating Facility to the ISO Controlled Grid and <br /> (ii) shall address the short circuit, instability, and power flow issues <br /> identified in the Interconnection System Impact Study. <br /> 5.0 The Interconnection Customer shall provide a deposit of the greater of <br /> $100,000 or the Interconnection Customer's portion of the estimated <br /> monthly cost for the performance of the Interconnection Facilities Study. <br /> The time for completion of the Interconnection Facilities Study is specified <br /> in Attachment A. For studies where the estimated cost exceed $100,000, <br /> the ISO may invoice Interconnection Customer on a monthly basis for the <br /> work to be conducted on the Interconnection Facilities Study for the <br /> remaining balance of the estimated Interconnection Facilities Study cost. <br /> The Interconnection Customer shall pay invoiced amounts within thirty <br /> (30) Calendar Days of receipt of invoice. The ISO shall continue to hold <br /> the amounts on deposit until settlement of the final invoice. <br /> Following the issuance of the Interconnection Facilities Study, the ISO <br /> shall charge and the Interconnection Customer shall pay the actual costs <br /> of the Interconnection Facilities Study, inclusive of any re-studies and <br /> amendments to the Interconnection Facilities Study, pursuant to Section 9 <br /> of this Agreement. <br /> Any difference between the deposit made toward the Interconnection <br /> Facilities Study and the actual cost of the study, inclusive of any re-studies <br /> and amendments thereto, shall be paid by or refunded to the <br /> Interconnection Customer, as appropriate in accordance with Section 13.3 <br /> of the LGIP. <br /> 6.0 The Interconnection Facilities Study will be based upon the results of the <br /> Interconnection System Impact Study and the technical information <br /> provided by the Interconnection Customer in the Interconnection Request, <br /> subject to any modifications in accordance with Section 4.4 of the LGIP. <br /> The ISO reserves the right to request additional technical information from <br /> the Interconnection Customer as may reasonably become necessary <br /> consistent with Good Utility Practice during the course of the <br /> Interconnection Facilities Study. <br /> 2 <br />