My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERCONNECTION FACILITIES STUDY AGREEMENT,ATTACHMENT C <br /> LODI ENERGY CENTER <br /> 9.3 Land Evaluation <br /> 9.3.1 Interconnection Facilities <br /> PG&E's Corporate Real Estate Department will assist the IC to <br /> determine if any new land rights and/or easements are required for the <br /> interconnection of the Project. <br /> 9.3.2 Network Upgrades <br /> PG&E's Corporate Real Estate Department will determine if any new <br /> land rights and/or easements are required for the Network Upgrades <br /> necessitated by the Project. This includes but is not limited to all <br /> transmission and substation Network Upgrades as determined by the <br /> ISIS. <br /> i Costs and Construction Schedule Estimates <br /> All costs provided will be estimates only. Charges for implementing the <br /> interconnection of the Project will be made based upon the actual costs <br /> incurred. <br /> 10.1 Interconnection Facilities Cost <br /> A cost estimate (+/-20%)will be provided based upon a <br /> commercial operation date of April 2012. This cost estimate will <br /> include any substation and transmission line facilities required to <br /> interconnect the Project. The estimate will not include any facilities <br /> constructed, owned, and operated by NCPA. <br /> 10.2 Network Upgrade Cost <br /> A cost estimate (+/-20%)will be provided for any transmission <br /> facility additions or upgrades for mitigating any adverse impacts on <br /> the CAISO Controlled Grid beyond the Point of Interconnection. <br /> 11. Environmental Evaluation/Permitting <br /> 11.1 CPUC General Order 131-D <br /> Pacific Gas and Electric Company(PG&E) is subject to the jurisdiction of <br /> the California Public Utilities Commission (CPUC) and must comply with <br /> CPUC General Order 131-D (Order) on the construction, modification, <br /> alteration, or addition of all electric transmission facilities (i.e., lines, <br /> substations, etc.). This includes facilities to be constructed by others and <br /> deeded to PG&E. The Order exempts PG&E from obtaining a formal <br /> 11 <br />
The URL can be used to link to this page
Your browser does not support the video tag.