My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i <br /> INTERCONNECTION FACILITIES STUDY AGREEMENT,ATTACHMENT C <br /> LODI ENERGY CENTER <br /> 12. Standby <br /> The IFAS will not address any requirements for standby power that the <br /> Project may require. The IC should contact their PG&E Generation <br /> Interconnection Services representative regarding this service. <br /> Note: The IC is urged to contact their PG&E Generation Interconnection <br /> Services representative promptly regarding stand-by service in order to <br /> ensure its availability for the Project start-up date. <br /> 113. Re-study <br /> The IFAS will be performed according to the assumptions shown in <br /> Section 5. If these assumptions are changed, a re-study may be <br /> required to re-evaluate the Project's impact on the CAISO Controlled <br /> Grid. The Interconnection Customer would be responsible for paying for <br /> any such re-study. Examples of changes that might prompt such a study <br /> are: <br /> • Higher queued project dropping out <br /> • Modifications to a higher queued project <br /> • Change in the IFAS assumptions <br /> • Withdrawal of a higher queued project in the vicinity of this Project <br /> 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.