Laserfiche WebLink
i <br /> INTERCONNECTION FACILITIES STUDY AGREEMENT,ATTACHMENT C <br /> LODI ENERGY CENTER <br /> 12. Standby <br /> The IFAS will not address any requirements for standby power that the <br /> Project may require. The IC should contact their PG&E Generation <br /> Interconnection Services representative regarding this service. <br /> Note: The IC is urged to contact their PG&E Generation Interconnection <br /> Services representative promptly regarding stand-by service in order to <br /> ensure its availability for the Project start-up date. <br /> 113. Re-study <br /> The IFAS will be performed according to the assumptions shown in <br /> Section 5. If these assumptions are changed, a re-study may be <br /> required to re-evaluate the Project's impact on the CAISO Controlled <br /> Grid. The Interconnection Customer would be responsible for paying for <br /> any such re-study. Examples of changes that might prompt such a study <br /> are: <br /> • Higher queued project dropping out <br /> • Modifications to a higher queued project <br /> • Change in the IFAS assumptions <br /> • Withdrawal of a higher queued project in the vicinity of this Project <br /> 13 <br />