Laserfiche WebLink
Table 5.1 B-1 <br /> Lodi Energy Center <br /> Building Dimensions Used for Modeling <br /> Dimension meters <br /> Structure Heigh t Length Width <br /> New Structures <br /> Combustion Turbines 10.7 13 11 <br /> HRSGs (New), Tier 1 9.1 57 9 <br /> HRSGs (New), Tier 2 32.0 30 9 <br /> CTG Inlet 21.3 14 9 <br /> Main Aux transformer 3.9 10 9 <br /> Auxilary Boiler 4.5 8 4 <br /> Boiler Enclosure 5.6 1 1 <br /> Water Treatment 12.2 49 20 <br /> Steam Transformer 3.9 12 9 <br /> Steam Turbine 10.7 43 14 <br /> Cooling Tower 9.8 103 13 <br /> Tank 18 12.2 15 <br /> Tank 09 12.2 9 <br /> Existing Structures <br /> Gas Turbines Skid 5.0 17 4 <br /> Gas Turbines Inlet 11.3 11 9 <br /> HRSGs, Tier 1 10.7 34 8 <br /> HRSGs, Tier 2 21.2 19 8 <br /> STIG Cooling Tower 6.0 9 7 <br /> Control Room 6.2 17 15 <br /> Old Office 3.8 12 9 <br /> Warehouse 5.7 21 18 <br /> Tank 1 9.1 12 <br /> Tank 2 9.1 12 <br /> Tank 3 9.1 12 <br /> Tank 4 9.1 12 <br /> Tank 5 9.1 12 <br /> Tank 6 4.6 8 <br />