Laserfiche WebLink
5.1C:EVALUATION OF BEST AVAILABLE CONTROL TECHNOLOGY <br /> TABLE 5.1C-2 <br /> Recent CO BACT Determinations for Combustion Turbines/HRSGs <br /> Averaging Control Method <br /> Facility District/State CO Limit Prd Used Date Permit Issued Source <br /> Gateway Generating Station BAAQMD 4.0 ppmc 3 hours oxidation catalyst July 2008(proposed BAAQMD <br /> permit) <br /> Colusa Generating Station EPA Region 9 3.0 ppmc 3 hours oxidation catalyst May 2008 EPA AQIA <br /> Russell City Energy Center BAAQMD 4.0 ppmc 3 hours oxidation catalyst June 2007 BAAQMD website <br /> Blythe Energy LLC(Blythe II)a MDAQMD 4.0 ppmc 3 hours oxidation catalyst April 2007 PSD permit <br /> San Joaquin Valley Energy Center EPA Region 9 4.0 ppmc 1 hour oxidation catalyst August 2006 PSD permit <br /> Pastoria Energy LLC SJVAPCD 9.0 ppmc 3 hours oxidation catalyst 2004 PSD amendment <br /> Magnolia Power Project SCAQMD 2.0 ppmc 1 hour oxidation catalyst February 2004 SCAQMD website <br /> Vernon City Power&Light SCAQMD 2.0 ppmc 3 hour oxidation catalyst February 2004 SCAQMD website <br /> PSO Southwestern Power Plant Oklahoma 25 ppmc -- oxidation catalyst February 2007 EPA RBLC <br /> Rocky Mountain Energy Center Colorado 3.0 ppmc -- oxidation catalyst May 2006 EPA RBLC <br /> Sierra Pacific Power Company Nevada 3.5 ppmc 3 hours oxidation catalyst August 2005 EPA RBLC <br /> Wanapa Energy Center Oregon 2.0 ppmc 3 hours oxidation catalyst August 2005 EPA RBLC <br /> Crescent City Power, LLC Louisiana 4.0 ppmcb annual oxidation catalyst June 2005 EPA RBLC <br /> Berrien Energy, LLC Michigan 2.0 ppmc 3 hours oxidation catalyst April 2005 EPA RBLC <br /> Turner Energy Center Oregon 2.0 ppmc/ 1 hour oxidation catalyst January 2005 EPA RBLC <br /> 3.0 ppmc <br /> Notes: <br /> a. Construction on hold. <br /> b. Separate CO limit set for duct burners;this limit is for turbines only. <br /> c. RBLC record indicates that project will not be built. <br /> SAC/371322/082330016(LEC-5.1 C_APPENDIX.DOC) 5.1C 9 <br />