Laserfiche WebLink
5.1C:EVALUATION OF BEST AVAILABLE CONTROL TECHNOLOGY <br /> TABLE 5.1C-3 <br /> Recent VOC BACT Determinations for Combustion Turbines/HRSGs <br /> Averaging <br /> Facility District/State VOC Limit Prd Duct Fired? Date Permit Issued Source <br /> Gateway Generating Station BAAQMD 2.0 ppmc 3 hours yes July 2008(proposed BAAQMD <br /> permit) <br /> Colusa Generating Station EPA Region 9 2.0 ppmc 1 hour yes May 2008 EPA AQIA <br /> Russell City Energy Center BAAQMD 2.0 ppmc 3 hours yes June 2007 BAAQMD website <br /> Blythe Energy LLC(Blythe II)a MDAQMD 1.0 ppmc 3 hours yes December 2005 CEC website <br /> Magnolia Power Project SCAQMD 2.0 ppmc 1 hour yes February 2004 SCAQMD website <br /> Vernon City Power& Light SCAQMD 2.0 ppmc 1 hour yes February 2004 SCAQMD website <br /> Rocky Mountain Energy Center Colorado 0.0029 __ unknown May 2006 EPA RBLC <br /> Ib/MMBtu <br /> Sierra Pacific Power Company Nevada 4.0 ppmc 3 hours yes August 2005 EPA RBLC <br /> Crescent City Power, LLC Louisiana 1.1 ppmc annual nob June 2005 EPA RBLC <br /> Turner Energy Center° Oregon 1.0 ppmc 3 hours yes January 2005 EPA RBLC <br /> Notes: <br /> a. Construction on hold. <br /> b. Separate VOC limit set for duct burners;this limit is for turbines only. <br /> c. RBLC record indicates that project will not be built. <br /> SAC/371322/082330016(LEC_5.1C_APPENDIX.DOC) 5.1C 11 <br />