Laserfiche WebLink
5.1C:EVALUATION OF BEST AVAILABLE CONTROL TECHNOLOGY <br /> TABLE 5.1C-4 <br /> Recent PM10 BACT Determinations for Combustion Turbines/HRSGs <br /> PM10 Limit, no duct PM10 Limit,with duct <br /> Facility District/State firing firing Date Permit Issued Source <br /> Colusa Generating Station EPA Region 9 12.9 Ib/hr 20.0 Ib/hr May 2008 CEC final decision <br /> Russell City Energy Center BAAQMD 8.6 Ib/hr 11.6 Ib/hr June 2007 BAAQMD website <br /> Blythe Energy LLC(Blythe II) MDAQMD 6.0 Ib/hra December 2005 CEC website <br /> Magnolia Power Project SCAQMD -- 11.0 Ib/hr February 2004 SCAQMD website <br /> Vernon City Power&Light SCAQMD -- 11.0 Ib/hr February 2004 SCAQMD website <br /> Rocky Mountain Energy Center Colorado -- 0.0074 Ib/MMBtu May 2006 EPA RBLC <br /> Sierra Pacific Power Company Nevada -- 0.011 Ib/MMBtu August 2005 EPA RBLC <br /> Crescent City Power, LLC Louisiana 29.6 Ib/hr 0.01 Ib/MMBtub June 2005 EPA RBLC <br /> Turner Energy Center' Oregon -- 18 Ib/hr January 2005 EPA RBLC <br /> Notes: <br /> a. Construction on hold. <br /> b.Annual limit. <br /> c. RBLC record indicates that project will not be built. <br /> SACI371322/082330016(LEC-5.1 C_APPENDIX.DOC) 5.1 C 13 <br />