My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
5.1C:EVALUATION OF BEST AVAILABLE CONTROL TECHNOLOGY <br /> TABLE 5.1C-4 <br /> Recent PM10 BACT Determinations for Combustion Turbines/HRSGs <br /> PM10 Limit, no duct PM10 Limit,with duct <br /> Facility District/State firing firing Date Permit Issued Source <br /> Colusa Generating Station EPA Region 9 12.9 Ib/hr 20.0 Ib/hr May 2008 CEC final decision <br /> Russell City Energy Center BAAQMD 8.6 Ib/hr 11.6 Ib/hr June 2007 BAAQMD website <br /> Blythe Energy LLC(Blythe II) MDAQMD 6.0 Ib/hra December 2005 CEC website <br /> Magnolia Power Project SCAQMD -- 11.0 Ib/hr February 2004 SCAQMD website <br /> Vernon City Power&Light SCAQMD -- 11.0 Ib/hr February 2004 SCAQMD website <br /> Rocky Mountain Energy Center Colorado -- 0.0074 Ib/MMBtu May 2006 EPA RBLC <br /> Sierra Pacific Power Company Nevada -- 0.011 Ib/MMBtu August 2005 EPA RBLC <br /> Crescent City Power, LLC Louisiana 29.6 Ib/hr 0.01 Ib/MMBtub June 2005 EPA RBLC <br /> Turner Energy Center' Oregon -- 18 Ib/hr January 2005 EPA RBLC <br /> Notes: <br /> a. Construction on hold. <br /> b.Annual limit. <br /> c. RBLC record indicates that project will not be built. <br /> SACI371322/082330016(LEC-5.1 C_APPENDIX.DOC) 5.1 C 13 <br />
The URL can be used to link to this page
Your browser does not support the video tag.