My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
ARCHIVED REPORTS LEC APPLICATION FOR CERTIFICATION
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:41:30 AM
Creation date
9/25/2019 4:52:39 PM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
ARCHIVED REPORTS
FileName_PostFix
LEC APPLICATION FOR CERTIFICATION
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1599
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
APPENDIX 5.1E <br /> Construction Emissions and Impact Analysis <br /> 5.1 E.1 Onsite Construction <br /> The initial construction of the LEC is expected to last approximately 24 months. <br /> Construction activities will occur in the following main phases: <br /> Site preparation; <br /> Foundation work; <br /> Installation of major equipment;and <br /> Construction/installation of major structures. <br /> 5.1E.1.1 Construction Activities <br /> The construction of LEC will begin with site preparation activities,which include <br /> installation of drainage systems,underground utilities and conduits, grading and <br /> backfilling operations,and installation of pilings. After site preparation is finished,the <br /> construction of the foundations and structures is expected to begin. Once the foundations <br /> and structures are finished,installation and assembly of the mechanical and electrical <br /> equipment are scheduled to commence. <br /> Fugitive dust emissions from the construction of the project will result from: <br /> • Dust entrained during site preparation and grading/excavation at the construction site; <br /> • Dust entrained during onsite travel on paved and unpaved surfaces; <br /> • Dust entrained during aggregate and soil loading and unloading operations; and <br /> • Wind erosion of areas disturbed during construction activities. <br /> • Combustion emissions during construction will result from: <br /> • Exhaust from the diesel construction equipment used for site preparation, grading, <br /> excavation,trenching, and construction of onsite structures; <br /> • Exhaust from water trucks used to control construction dust emissions; <br /> • Exhaust from portable welding machines; <br /> • Exhaust from pickup trucks and diesel trucks used to transport workers and materials <br /> around the construction site; <br /> • Exhaust from diesel trucks used to deliver concrete,fuel, and construction supplies to <br /> the construction site;and <br /> SAC/371322/082330017(LEC_5.1 E_APPENDIX.DOC) 5.1 E-1 <br />
The URL can be used to link to this page
Your browser does not support the video tag.