Laserfiche WebLink
Daily and Annual Construction Emissions <br /> Daily Construction Emissions (peak month) <br /> (lbs/day) <br /> NOx CO VOC SOx PM2.5 PM10 <br /> Onsite <br /> Construction Equipment 80.61 51.42 7.72 0.10 4.46 4.46 <br /> Fugitive Dust 4.94 21 .01 <br /> Subtotal = 80.61 51.42 7.72 0.10 9.40 25.47 <br /> Offsite <br /> Worker Travel 12.07 125.61 11 .91 0.11 1 .16 1 .16 <br /> Truck Deliveries 167.46 61.55 13.01 0.14 6.90 6.90 <br /> Subtotal = 179.52 187.16 24.92 0.26 8.06 8.06 <br /> Total = 260.13 238.58 32.65 0.36 17.47 33.53 <br /> Peak Annual Construction Emissions (12-month period) <br /> (tons/yr) <br /> NOx CO VOC SOx PM2.5 PM10 <br /> Onsite <br /> Construction Equipment 7.22 4.64 0.71 0.01 0.41 0.41 <br /> Fugitive Dust 0.27 1 .61 <br /> Subtotal = 7.22 4.64 0.71 0.01 0.68 2.02 <br /> Offsite <br /> Worker Travel 1 .68 17.50 1 .66 0.02 0.16 0.16 <br /> Truck Deliveries 0.58 0.21 0.05 0.00 0.02 0.02 <br /> Subtotal = 2.27 17.71 1 .70 0.02 0.19 0.19 <br /> Total = 9.49 22.35 2.42 0.03 0.87 2.21 <br />