My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE 2000-2018
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0516806
>
SITE INFORMATION AND CORRESPONDENCE 2000-2018
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 8:48:15 AM
Creation date
9/26/2019 8:34:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
FileName_PostFix
2000-2018
RECORD_ID
PR0516806
PE
2965
FACILITY_ID
FA0012817
FACILITY_NAME
WHITE SLOUGH WATER POLLUTION CONTRO
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95241
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
226
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Craig Hoffman -3- 10 February 2017 <br /> City of Lodi <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/constpermits.shtml <br /> Phase I and II Municipal Separate Storm Sewer System (MS4) Permits' <br /> The Phase I and II MS4 permits require the Permittee to reduce pollutants and runoff flows from <br /> new development and redevelopment using Best Management Practices (BMPs) to the <br /> maximum extent practicable (MEP). MS4 Permittees have their own development standards, <br /> also known as Low Impact Development (LID)/post-construction standards that include a <br /> hydromodification component. The MS4 permits also require specific design concepts for <br /> LID/post-construction BMPs in the early stages of a project during the entitlement and CEQA <br /> process and the development plan review process. <br /> For more information on which Phase I MS4 Permit this project applies to, visit the Central <br /> Valley Water Board website at: <br /> http:fhroww.waterboards.ca.gov/centralvaMey/water issues/storm—water/municiaarpermits/ <br /> For more information on the Phase II MS4 permit and who it applies to, visit the State Water <br /> Resources Control Board at: <br /> http://www.waterboards.ca.gov/water issues/programs/stormwater/phase ii municipal.shtml <br /> Industrial Storm Water General Permit <br /> Storm water discharges associated with industrial sites must comply with the regulations <br /> contained in the Industrial Storm Water General Permit Order 2014-0057-DWQ. <br /> For more information on the Industrial Storm Water General Permit, visit the Central Valley <br /> Water Board website at: <br /> http://www.waterboards.ca.govlcentralvalley/water issues/storm—water/industrial general perm <br /> its/index.shtml. <br /> Clean Water Act Section 404 Permit <br /> If the project will involve the discharge of dredged or fill material in navigable waters or <br /> wetlands, a permit pursuant to Section 404 of the Clean Water Act may be needed from the <br /> United States Army Corps of Engineers (USACOE). If a Section 404 permit is required by the <br /> USACOE, the Central Valley Water Board will review the permit application to ensure that <br /> discharge will not violate water quality standards. If the project requires surface water drainage <br /> realignment, the applicant is advised to contact the Department of Fish and Game for <br /> information on Streambed Alteration Permit requirements. <br /> If you have any questions regarding the Clean Water Act Section 404 permits, please contact <br /> the Regulatory Division of the Sacramento District of USACOE at (916) 557-5250. <br /> Clean Water Act Section 401 Permit—Water Quality Certification <br /> If an USACOE permit (e.g., Non-Reporting Nationwide Permit, Nationwide Permit, Letter of <br /> Permission, Individual Permit, Regional General Permit, Programmatic General Permit), or any <br /> other federal permit (e.g., Section 9 from the United States Coast Guard), is required for this <br /> ' Municipal Permits=The Phase I Municipal Separate Storm Water System (MS4) Permit covers medium sized <br /> Municipalities (serving between 100,000 and 250,000 people) and large sized municipalities (serving over <br /> 250,000 people). The Phase II MS4 provides coverage for small municipalities, including non-traditional Small <br /> MS4s,which include military bases, public campuses, prisons and hospitals. <br />
The URL can be used to link to this page
Your browser does not support the video tag.