Laserfiche WebLink
�� Sl <br /> N <br /> A <br /> C' <br /> It <br /> ✓ Y�I Yom".. p._ . <br /> P <br /> ,s Y ,BG4 0 ® SGS <br /> s <br /> B. � . . _. <br /> MIA <br /> Y.lik ` 2 <br /> 12 <br /> -t- 14 <br /> z � 16 ® e.17 <br /> ..'u ® B <br /> \i 4- j <br /> _ wi <br /> . m <br /> LEGEND NOTES; <br /> PREVIOUS SHALLOW SOIL SAMPLE LOCATIONS(CH2MHILL) 1. MAP REFERENCES;CH2MHILL,SOIL SAMPLINGLOCATIONS, <br /> FIGURE 2, DATED FEBRUARY 11,2009. USGS URBAN AERIAL <br /> ® PROPOSED LAYDOWN AND/OR PARKING AREAS IMAGE,DATED MARCH 29,2004. <br /> 2. CALIFORNIA STATE PLANES,ZONE 3(FT.),NOT A SURVEYED MAP, <br /> CPROPOSED PLANT SITE SITE FEATURES AND LOCATIONS ARE APPROXIMATE. <br /> 8-#- PROPOSED SOIL BORING LOCATIONS(STANTEC) <br />' B(3440- PROPOSED BACKGROUND SOIL SAMPLING LOCATIONS 0 125 250 <br /> APPROXIMATE SCALE (FEET) <br /> V- FOR: FIGURE: <br /> LODI ENERGY CENTER PROPOSED SAMPLING LOCATIONS �f <br /> 12745 North Thornton Road L <br /> Stantec Lodi, CA 95240 <br /> 290 Conejo Ridge Avenue <br /> Thousand Oaks,CA 91361 JOB NUMBER: DRAWN BY: CHECKED BY: APPROVED BY: DATE: <br /> (805)230-1266/230-1277(Fax) 185702076 R.Roman C.Confar C.Confer 08/04/09 <br /> FILEPATH:O:\CADD-37\Client\Lodi_Energy_Center\WorkPlan\2009-Aug\LEC-SLM.dwgltromanlAug 11,2009 at 14:5711-ayout SM <br />