My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ROBERT N. KULL, P.E. <br /> Environmental Department Manager <br /> Mr. Kull has 15 years of environmental engineering experience, primarily <br /> in hazardous waste remediation. His experience encompasses a broad <br /> range of projects for public, private, industrial and government clients, <br /> including field investigations, feasibility studies, remedial design and <br /> construction, and operation and maintenance activities For soil and <br /> groundwater remediation systems. Mr. Kull has managed a groundwater- <br /> monitoring program for an Army installation in Arizona. He was the <br /> Technical Lead for the design and construction of two large soil <br /> remediation systems and the Technical Lead for the design and <br /> construction of three engineered landfill caps at a former Air Force base in <br /> California. In addition, Mr. Kull served as the Project Manager for the <br /> design and construction of a passive landfill gas migration control system <br /> and the Project Manager of several CERCIA and non-CERCLA remedial <br /> sites. Mr. Kull completed a Master Plan evaluation/revision for a <br /> wastewater treatment plant and associated facilities at a resort in Napa <br /> Valley, California. Mr. Kull was the Technical Lead for modifications to <br /> several existing groundwater remediation systems. In addition, he <br /> managed a Superfund contract with the U.S.Army Corp of Engineers and <br /> a county project,both which involved optimization,design and operation <br /> and maintenance of a soil vapor extraction system and a groundwater <br /> pump and treat system. <br /> Mr. Kull is currently the Project Manager for several El Dorado Irrigation <br /> District water conveyance projects located throughout the foothills of the <br /> Sierra Nevada. He is also the Project Manager for several sites requiring <br /> soil and groundwater remediation due to chlorinated solvent and <br /> petroleum hydrocarbon impacts. <br /> Specialization: Hazardous Waste Investigation and <br /> Remediation <br /> Education: Master of Science Degree in Civil and <br /> Environmental Engineering, Cal Poly State <br /> University, San Luis Obispo, 1993 <br /> Bachelor of Science Degree in Agricultural <br /> Engineering, Cal Poly State University, San <br /> Luis Obispo, 1991 <br /> Total Years Experience: 15 <br /> Total Years with Carlton: 4 <br /> Professional Registrations: Professional Engineer(Civil), California, <br /> C55037 <br /> Professional Certifications: Project Management Training-PM1 2003 <br /> OSHA 40-Hour HazWaste Training <br /> (29CFR1910.120) <br /> OSHA 8-Hour Supervisors Training <br /> (29CFR1910.12e4) <br />
The URL can be used to link to this page
Your browser does not support the video tag.