My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
® WorleyParsons <br /> resources&energy <br /> 5.0 CONTROL AND INSTRUMENT DESIGN CRITERIA <br /> 5.1 General <br /> The complete plant will be monitored and controlled by a Distributed Control System <br /> (DCS). <br /> Auxiliaries such as small sump pumps that need not be in continuous operation for electric <br /> power production will be monitored, controlled, and protected locally, with limited DCS <br /> monitoring and control. <br /> 5.2 Automatic Generation Control (AGC) <br /> The plant will be capable of set point remote block Automatic Generation Control (AGC) <br /> from CAISO or NCPA dispatch. The reference point for the AGC will be the net plant <br /> revenue meter(s) on the generator step-up transformer(s). <br /> Plant data will be communicated to Pacific Gas & Electric (PG&E) and CAISO. The inputs <br /> required must be provided by PG&E/CAISO and an example is indicated in the table <br /> below: <br /> INPUTS REQUIRED <br /> ITEM STATUS/UNITS MW MVAR MW MVAR COMMENTS <br /> HR HR <br /> T-Line Revenue Ok/trouble X X X X <br /> Metering Point each <br /> GSUT High Side kV <br /> voltage <br /> GSUT High Side Hz <br /> Frequency <br /> High Voltage Circuit Open/close/trip <br /> Breaker(s) <br /> AGC Set Point MW Feed back <br /> AGC High and Low MW <br /> Limits <br /> Generator Circuit Open/Close/Trip <br /> Breaker CTG <br /> Generating Unit On/Off, AGC X X X X <br /> each enabled <br /> High Temperature Deg F <br /> Control Limit <br /> Gas Turbine Inlet Air Deg F <br /> Temperature <br /> Ambient Air Deg F <br /> Temperature <br /> Net Plant Fuel Flow MMBTU/Hr and <br /> Standard Cu- <br /> Ft/HR <br /> Auxiliary Power X X X X <br /> Lodi Energy Center 3.5 - 1 LEC AFC <br /> 071608 Rev.A <br />
The URL can be used to link to this page
Your browser does not support the video tag.