My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INTERCONNECTION FACILITIES STUDY AGREEMENT,ATTACHMENT C <br /> LODI ENERGY CENTER <br /> 2. Study Fee <br /> The estimated study fee is $150,000 for performing the IFAS. The final <br /> cost to complete the IFAS will be based on actual cost. A $100,000 <br /> deposit will be needed when the Interconnection Customer returns the <br /> signed IFASA to CAISO. <br /> CAISO will provide the IC a record of actual costs for performing the <br /> IFAS. CAISO will invoice the IC the remaining balance if the actual cost is <br /> higher than the collected deposit. If the actual cost is less than the <br /> collected deposit, CAISO will refund the balance to the IC. <br /> 3. Schedule <br /> In order to comply with the recent CAISO GIPR filling with FERC, PG&E will <br /> provide a draft IFAS report to CAISO by September 15, 2008. CAISO will review, <br /> update if necessary, and issue the draft report to the IC for comments within 15 <br /> calendar days (CD) after receipt from PG&E. The final report will be issued within 7 <br /> CD after receiving comments from the IC. <br /> Per the LGIP, the IC must execute and return the attached IFASA along <br /> with the study deposit of$100,000 within thirty calendar days (CD)from the <br /> receipt of this IFASA. If the IC fails to return an executed IFASA with the <br /> study deposit within 30 CD of receipt, the Project will be deemed withdrawn <br /> and will be processed pursuant to Section 3.8 of the LGIP. <br /> i <br /> i <br /> - 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.