Staff also believes that the "No Project Alternative" is not superior to the proposed <br /> project. The No Project scenario would likely delay development of reliable electrical <br /> resources required for the region and could impact electrical supply reliability to the <br /> affected service area. Therefore, staff does not recommend alternative generation <br /> technologies or alternative sites over the technology proposed LEC. <br /> NOTEWORTHY PUBLIC BENEFITS <br /> SOCIOECONOMICS <br /> Important public benefits discussed under the fiscal and non-fiscal effects Application <br /> For Certification section are: operation and maintenance, and employment. The annual <br /> operations and maintenance budget is expected to be approximately $3.5 million (based <br /> on 2008 dollars), of which $2.2 million is likely to be spent locally within San Joaquin <br /> County. <br /> During the 24-month construction period, the project would provide at its peak 305 <br /> construction jobs. During non-peak times that number is projected to be 168 employees. <br /> When completed the LEC facility would permanently employ 5 to 7 new employees and <br /> share 21 to 23 employees (16 existing staff from the NCPA CTP#2). It is estimated that <br /> 60% of the construction workforce would reside in San Joaquin County, and that <br /> approximately $16.08 million would stay in the local area during the construction period. <br /> In addition to the direct employment benefit, the LEC plant will require and use the <br /> services of local or regional firms for major maintenance, plant supplies, and other <br /> support services throughout the life of the facility. <br /> RECOMMENDATIONS AND SCHEDULE <br /> For a more detailed review of potential impacts, see staffs technical analyses in the SA. <br /> Staff has listed the outstanding issues as applicable in the technical sections of the SA. <br /> To resolve these issues, staff requires either additional data, further discussion and <br /> analysis, or is awaiting information from a permitting agency prescribing mitigation. <br /> Absent any non-compliance with LORS or significant direct or indirect environmental <br /> impacts, staff concludes there will not be a disproportionately high and adverse human <br /> health or environmental effect on a minority and/or low-income population, and thus, no <br /> disproportional impact to an environmental justice population. <br /> In conclusion, based on the information available at this time, staff will work to resolve <br /> the outstanding issues and to update our preliminary conclusions. The project is being <br /> reviewed under the 12-month AFC process. Staff will conduct a public workshop on the <br /> SA within 30 days of its publication with a date to be determined in November 2009. <br /> October 2009 1-9 EXECUTIVE SUMMARY <br />