Laserfiche WebLink
5.16 WORKER HEALTH AND SAFETY <br /> TABLE 5.16-1 <br /> Construction Hazard Analysis for the LEC <br /> Activity Hazard' Control <br /> Hot work(including cutting and Employee injury and property Hot Work Safety Program; <br /> welding) damage from fire; exposure to Respiratory Protection Program; <br /> fumes during cutting and Employee Exposure Monitoring <br /> welding; ocular exposure to Program; Personal Protective <br /> ultraviolet and infrared radiation Equipment(PPE)Program <br /> during cutting and welding <br /> Inspection and maintenance of Employee injury and property Electrical Safety Program <br /> temporary systems used during damage from contact with <br /> construction activities hazardous energy sources <br /> (electrical,thermal, mechanical, <br /> etc.) <br /> Working on electrical equipment Employee contact with live Electrical Safety Program; PPE <br /> and systems electricity and energized Program <br /> equipment <br /> Exposure to Hazardous Waste Personnel who are working with Hazardous Waste Program <br /> or have the potential to be <br /> exposed to contaminated soil, <br /> groundwater, or debris during <br /> construction <br /> Confined space entry Employee injury from physical Permit-Required; Confined-Space Entry <br /> and chemical hazards Program <br /> General construction activity Employee injury from hand and Hand and Portable Power Tool Safety <br /> portable power tools Program; PPE Program <br /> General construction activity Employee injury/property Housekeeping and Material Handling <br /> damage from inadequate walking and Storage Program <br /> and work surfaces <br /> General construction activity Employee exposure to Hearing Conservation Program <br /> occupational noise PPE Program <br /> General construction activity Employee injury from improper Back Injury Prevention Program <br /> lifting and carrying of materials <br /> and equipment <br /> General construction activity Employee injury to head, PPE Program <br /> eye/face, hand, body,foot, and <br /> skin <br /> General construction activity Employee exposure to Hazard Communication Program; <br /> hazardous gases, vapors, dusts, Respiratory Protection Program; <br /> and fumes PPE Program;Air Monitoring Program <br /> General construction activity Employee exposure to various Injury and Illness Prevention Program <br /> hazards; reporting of hazardous <br /> conditions during construction <br /> General construction activity Heat and cold stress Heat and Cold Stress Monitoring and <br /> Control Program <br /> SAC/371322/082330005(LEC_5.16_WORKERHEALTHSAFETY.DOC) 5.16-3 <br />