My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
CONTENTS <br /> 5.14-2 Hazardous Wastes Generated During Operations..........................................5.14-6 <br /> 5.14-3 Solid Waste Disposal Facilities in the Vicinity of the LEC Project.................5.14-9 <br /> 5.14-4 Laws,Ordinances,Regulations,and Standards for Waste Management...5.14-15 <br /> 5.14-5 Agency Contacts for Waste Management.......................................................5.14-20 <br /> 5.15-1 Clean Water Act Section 303(d) List of Water Quality Impairments in the <br /> Sacramento-San Joaquin River Delta.................................................................5.15-2 <br /> 5.15-2 Water Quality Characteristics of Surface Waters in the Vicinity of the <br /> LECProject Site.....................................................................................................5.15-5 <br /> 5.15-3 Average Rainfall near the Proposed Project Site (Lodi, California) <br /> (1948-2007) .............................................................................................................5.15-6 <br /> 5.15-4 Minimum Beneficial Use Exception Criteria.....................................................5.15-6 <br /> 5.15-5 Groundwater Quality in the Vicinity of the LEC Project Site.........................5.15-9 <br /> 5.15-6 WPCF Expected Water Quality Data...............................................................5.15-15 <br /> 5.15-7 LEC Flow Rates...................................................................................................5.15-15 <br /> 5.15-8 Expected LEC Water Quality............................................................................5.15-17 <br /> 5.15-9 Pre-development Runoff for the LEC Site.......................................................5.15-18 <br /> 5.15-10 Post-development Runoff for the LEC Site.....................................................5.15-18 <br /> 5.15-11 Average Influent Flows to the Lodi WPCF (2002-2005)................................5.15-24 <br /> 5.15-12 Current and Projected Wastewater Flow........................................................5.15-24 <br /> 5.15-13 Laws,Ordinances,Regulations,and Standards for Water Resources...........5.15-26 <br /> 5.15-14 Permits and Permitting Agencies for Water Resources ................................5.15-31 <br /> 5.16-1 Construction Hazard Analysis for the LEC......................................................5.16-2 <br /> 5.16-2 Operation Hazard Analysis for the LEC...........................................................5.16-4 <br /> 5.16-3 Construction Training Program for the LEC..................................................5.16-14 <br /> 5.16-4 Operations Training Program for the LEC......................................................5.16-15 <br /> 5.16.5 Laws,Ordinances,Regulations, and Standards for Worker Health <br /> andSafety.............................................................................................................5.16-16 <br /> 5.16-6 Agency Contacts for Worker Health and Safety............................................5.16-23 <br /> 5.16-7 Permits and Permit Schedule for Worker Health and Safety.......................5.16-24 <br /> 6.4-1 Environmental and Project Development Constraints of the LEC and <br /> AlternativeSites.......................................................................................................6-13 <br /> Figures <br /> 1.1-1 Architectural Rendering <br /> 1.1-2 Project Vicinity Map <br /> 1.1-3 Site Location <br /> 2.1-1 General Arrangement <br /> 2.1-2 Elevations <br /> 2.1-3 Proposed Laydown and Parking Areas <br /> 2.14A Heat Balance Diagram <br /> 2.1-413 Heat Balance Data <br /> 2.1-5A Water Balance Diagram <br /> SAC/371322/082490010(LEC_CONTENTS.DOC) xiii <br />
The URL can be used to link to this page
Your browser does not support the video tag.