My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
SITE INFORMATION AND CORRESPONDENCE
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
SITE INFORMATION AND CORRESPONDENCE
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:54:09 AM
Creation date
9/26/2019 8:57:07 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
SITE INFORMATION AND CORRESPONDENCE
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
1626
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Soil Type Acreage Soil Loss Estimates Using RUSLE2 software(tons/ac/year) <br /> Site Sloe Grading Construction w/o BMPs Construction with BMPs No Project <br /> Site 4.40 1.0 1.1 0.51 0.014 0.0053 <br /> subtotal 4.84 2.24 0.06 0.0233 <br /> Laydown Areas (A through D) 9.80 1.0 1.1 0.51 0.014 0.0053 <br /> subtotal 10.78 5.00 0.137 0.0519 <br /> Gas Supply Pipeline 9.09 1.0 1.1 0.51 0.014 0.0053 <br /> subtotal 10.00 4.64 0.127 0.0482 <br /> Transmission Line Pole 0.00 1.0 1.1 0.51 0.014 0.0053 <br /> subtotal 0.00 0.00 0.00 0.00 <br /> Process Water Line 0.00 1.0 1.1 0.51 0.014 0.0053 <br /> subtotal 0.00 0.00 0.00 0.00 <br /> Sewer Line 0.00 1.0 1.1 0.51 0.014 0.0053 <br /> subtotal 0.00 0.00 0.00 0.00 <br /> Assumptions: <br /> Assumes slope is the mid-point of the slope class <br /> 100%of project site would be bare soil during grading. <br /> 100%of pole holes will be bare soil during grading/excavation. <br /> The No Project soil loss assumes a'dense grass, not harvested' management scenario. <br /> 9/4/2008 <br />
The URL can be used to link to this page
Your browser does not support the video tag.