Laserfiche WebLink
Project:LEC-Steve Long input for areas on 5/30/08-subject to revision <br /> OBJECTID AREASYMBOL Portion iape_Area or Lenc Acres Acreage tot <br /> LEC Site 149-Devries SL 100.0% 3.79 4.40 From Sarah Madams email dated 7/10/08 <br /> 0.44 Assumes only 10%of site is bare soil during construction <br /> Laydown Area A 149-Devries SL 100.0% 2.49 2.49 From Mike Haskell email dated 5/508 <br /> Laydown Area B 149-Devries SL 100.0% 2.22 2.22 From Mike Haskell email dated 5/508 <br /> Laydown Area C 149-Devries SL 100.0% 1.54 1.54 From Mike Haskell email dated 5/508 <br /> Laydown Area D 149-Devries SL 100.0% 2.74 2.74 From Mike Haskell email dated 5/508 <br /> 9.80 Assumes laydown areas are completely covered(paved or gravelled)during construction.Revised by email from Sarah Madams Aug 27. <br /> Natural gas supply pipeline-trench 149-Devries SL 100.0% 13200 1.2121 1.21 Edit from 2.6 miles to 2.5 miles in text from Sarah Madams on 7/10/2008 stating 2.5 mile length.Assumes 4 foot wide trench <br /> Natural gas supply pipeline-corridor 149-Devries SL 100.0% 13200 9.0909 9.09 Edit from 2.6 miles to 2.5 miles in text from Sarah Madams on 7/10/2008 stating 2.5 mile length.Assumes 30 foot wide construction corridor <br /> 10.30 <br /> Sum 20.543 Assumed 100%exposed during construction <br /> Construction <br /> Pole Holes Corridor <br /> Tranmission Line Pole 149-Devries SL 0 0.0000 0.0000 Assumes no 4x4 ft holes are needed off site to connect to existing OH lines <br /> 0 sum 0 0 0.0000 0.0000 0.0000 <br /> 0.0000 Assumed pole hole footprint will be unprotected until pole installed <br /> Construction <br /> Corridor <br /> Trench acres acres <br /> Process water supply pipeline - 0 0 0 Assumes on-site connection <br /> 9/4/2008 <br />