Laserfiche WebLink
ATTACHMENT P:MONITORING PROGRAM <br /> - chloroform <br /> - turbidity <br /> 2. Inorganics: <br /> - barium,bicarbonate,calcium,chloride,copper,fluoride,iron,magnesium, <br /> nitrate,potassium,silica,sodium,sulfate,zinc. <br /> Quarterly and Annual Fluid Sampling, Chemical Analyses <br /> Prior to initial operations,and once a quarter thereafter,the samples will also be tested for <br /> all of the substances and parameters contained in 40 CFR§261.24 and Title 22 of the <br /> California Code of Regulations (CCR) § 66261.24. The testing performed on the samples will <br /> follow the procedures listed in either 40 CFR 261 Appendix III or Title 22 of the CCR <br /> § 66261.126 Appendix I1I. <br /> If a constituent is not detected during the first 12 months of injection well operation,future <br /> tests for that constituent will be conducted only once a year.Thereafter,if no amounts are <br /> reported above the detection limit for four consecutive annual sampling periods,no future <br /> tests for that constituent will be conducted. <br /> Fluid Analyses Reports <br /> The results of the monthly and quarterly injection fluid chemical analyses will be compiled <br /> and presented,together with a summary of the continuously recorded injection fluid <br /> parameters,in a comprehensive report to be submitted quarterly. That report will include a <br /> completed EPA Form 7520-8 and,on an annual basis, a completed EPA Form 7520-11. <br /> Groundwater Monitoring Program <br /> No additional groundwater monitoring wells or operations are planned for this program. <br /> Existing groundwater monitoring wells surround the STIG-1 site, and they will continue to <br /> be monitored as part of the permit conditions for operations at the City of Lodi White <br /> Slough Water Pollution Control Facility. <br /> SACI3713221082560022(ATTACH MENT-P.DOC) P-3 <br />