Laserfiche WebLink
6. Iniection Intervals <br /> Injection for wells STIG-1, LEC-1 and LEC-2 shall be permitted for the lower sand <br /> member of the Domengine Formation at depths between approximatel4 le <br /> bgs and 4,507 feet bgs. The entire injection unit is 831 feet thick at -1, La <br /> extending from 3,747 feet bgs to 4,578 feet bgs (the rmit is not less than 780 feet <br /> within'the Area of Review). The exact depths of injection zone intervals and casing <br /> setting depths are expected to be realized upon drilling. These alterations and other <br /> rework operations that may occur later in the course of operation of the wells are <br /> considered minor for this permit and must be properly reported (use EPA Form <br /> 7520-12). The Permittee must demonstrate that each well has mechanical integrity, <br /> in accordance with Section D paragraphs 1(a) and 2 of this part, before any initial <br /> injection is authorized or before injection is recommenced after a workover has <br /> compromised the seal (see Part ILD.2(b)(i)). <br /> 7. Confining Laver <br /> The upper confining layer, the Nortonville Shale, is a dark gray marine shale and <br /> siltstone. It ranges in thickness from 100 to 200 feet within the Area of Review,with <br /> a thickness of 117 feet at the STIG-1 well. The Nortonville Shale confining layer is <br /> located between approximately 3,610 and 3,727 feet bgs. <br /> The lower confining layer, the Capay Shale Formation, is a marine shale to silty <br /> shale with occasional sand stringers. The estimated thickness of the Capay confining <br /> layer is approximately 150 feet, from 4,578 to 4,728 feet bgs. <br /> Field information on the Nortonville Shale formation at the LEC-1 and LEC-2 sites, <br /> such as its characteristics,thickness, and local structure will be obtained and updated <br /> during drilling of the injection wells and shall be included in the Final Well <br /> Construction Report required in paragraph 9(a) of this section. <br /> 8. Monitoring Devices <br /> The Permittee shall install and maintain in good operating condition: <br /> (a) A tap on the discharge line between the injection pump and the wellhead for <br /> the purpose of obtaining representative samples of injection fluids;and <br /> '(b) Devices to continuously measure and record injection pressure, annulus <br /> pressure, flow rate, and injection volumes,subject to the following: <br /> (i) Pressure gauges shall be of a design to provide: <br /> (1) A Rill pressure range of at least fifty (50) percent greater than <br /> the anticipated operating pressure; and <br /> FINAL UIC Permit CA 10910003 <br /> Page 10 of 29 <br />