Laserfiche WebLink
under this permit in accordance with 40 CFR §146.8 and paragraph <br /> (a)(iii)above. <br /> (iii) At least once every five (5) years during the life of the well, an <br /> internal pressure MIT shall be conducted on each injection well <br /> authorized under this permit in accordance with 40 CFR §146.8 and <br /> paragraph(a)(i) above. <br /> (c) Loss of Mechanical Inteerity <br /> The Permittee shall notify EPA, in accordance with Part III, Section E <br /> paragraph 10 of this permit,under any of the following circumstances: <br /> (i) The well fails to demonstrate mechanical integrity during a test,or <br /> (ii) A loss of mechanical integrity becomes evident during operation, or <br /> (iii) A significant change in the annulus or injection pressure occurs <br /> during normal operating conditions. See Section D.6 of this part. <br /> Furthermore, in the event of (i), (ii), or (iii), injection activities shall be <br /> terminated immediately and operation 'shall not be resumed until the <br /> Permittee has taken necessary actions to restore mechanical integrity to the <br /> well and EPA gives approval to recommence injection. <br /> (d) Prohibition without Demonstration <br /> After the permit effective date,injection into wells may continue only if: <br /> (i) The well has passed an internal pressure MIT in accordance with <br /> paragraph 2(a)(i) of this section; and <br /> (ii) The Permittee has received written notice from EPA that the internal <br /> pressure MIT demonstration is satisfactory. <br /> 3. Iniection Pressure Limitation <br /> (a) Maximum allowable injection pressure measured at the wellhead for wells <br /> STIG-1, LEC-1 and LEC-2 shall be based on the Step-Rate Test conducted <br /> under Section B paragraph 3(b) of this part. EPA will provide the Permittee <br /> written notification of the maximum allowable injection pressure for each <br /> injection well constructed and operated under this permit, along with a minor <br /> modification of the permit under 40 CFR §144.41(e). <br /> FINAL UIC Permit CA10910003 <br /> Page 15 of 29 <br />