My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:35:34 AM
Creation date
9/26/2019 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
that the plugging and abandonment be witnessed by an EPA representative. <br /> 2. Plugging and Abandonment Plans <br /> The Permittee shall plug and abandon the well(s) as provided in Appendix F, the <br /> general Plugging and Abandonment Program submitted as Attachment Q to the <br /> application, and consistent with CDOGGR requirements and 40 CFR §146.10. EPA <br /> reserves the right to change the manner in which a well will be plugged if the well is <br /> modified during its permitted life or if the well is not consistent with EPA <br /> requirements for construction or mechanical integrity. EPA may require the <br /> Permittee to update the estimated plugging cost periodically. Such estimates shall be <br /> based upon costs which a third party would incur to plug the wells, including mud <br /> and disposal costs,with appropriate contingencies. <br /> 3. Cessation of Injection Activities <br /> After a cessation of injection operations for two (2) years, the Permittee shall plug <br /> and abandon the inactive well(s) in accordance with the Plugging and Abandonment <br /> Plans,unless it: <br /> (a) Provides notice to EPA; <br /> (b) Has demonstrated that the well(s)will be used in the future; and <br /> (c) Has described actions or procedures, satisfactory to EPA, that will be taken <br /> to ensure that the well(s) will not endanger underground sources of drinking <br /> water during the period of temporary abandonment. <br /> 4. Plug ig_ng and Abandonment Report <br /> Within sixty(60) days after plugging any well,the Permittee shall submit a report on <br /> Form 7520-13, provided in Appendix C, to EPA. The report shall be certified as <br /> accurate by the person who performed the plugging operation and shall consist of <br /> either: <br /> (a) A statement that the well was plugged in accordance with the approved <br /> Plugging and Abandonment Plans, or <br /> (b) Where actual plugging differed from the Plugging and Abandonment Plans, a <br /> statement specifying the different procedures followed. <br /> FINAL UIC Permit CA 10910003 <br /> Page 23 of 29 <br />
The URL can be used to link to this page
Your browser does not support the video tag.