Laserfiche WebLink
APPENDIX F-Plugging and Abandonment Plans <br /> Upon completion of injection activities the well(s) shall be abandoned according to State and <br /> Federal regulations to ensure protection of Underground Sources of Drinking Water. <br /> titiui7fi7ti'Ax lNY,Rllnel ttv+dttw.A neliek�yBM, <br /> nw'.1Nw ws:iss a-%15J'�.. �.e.wv <br /> baa - <br /> �ur <br /> Ilan <br /> rMp <br /> e,4 <br /> nW ' <br /> iun i <br /> pQMgNA7r1S S SAND r <br /> Lra <br /> MIELLBORE sGHEMATICS OF <br /> THE S`104.80 MdILiTY <br /> swrou: INJECTION WALLS' <br /> bbAhOM CQ1kMfSCy: <br /> P�&VrApeP1994 Ut^PCNMAnP1ICAik7(( NxErs <br /> Figure 1. General Plugging and Abandonment plan schematics for wells STIG-1, LEC-1 and LEC- <br /> 2 (from Attachment Q of the Permit Application). <br /> FINAL UIC Permit CA 10910003 <br />