My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:35:34 AM
Creation date
9/26/2019 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
oof srgrfs. • 0 f,&'. <br /> 2•� � ru <br /> UNITED STATES ENVIRONMENTAL PROTECTION AGENCY <br /> REGION IX <br /> 75 Hawthorne Street <br /> San Francisco, CA 94105.3901 <br /> Mail Code WTR-9 <br /> October 16,2009 <br /> Mr. Michael DeBortoli <br /> Electrical/IT Engineer <br /> Northern California Power Agency <br /> 651 Commerce Drive <br /> Roseville,CA 95678-6420 <br /> Re: Public Notice of Intent to Issue <br /> UIC Permit No. CA10910003 <br /> Northern California Power Agency <br /> STIG-1, LEC-1, LEC-2 Class I-NH UIC Injection Wells <br /> Dear Mr.DeBortoli: <br /> This letter is to notify you that the public comment period for the subject permit came to <br /> a close with no comments having been submitted. Therefore, the United States <br /> Environmental Protection Agency, Region IX ("EPA") is issuing a final Class I-NH <br /> Underground Injection Control(UIC)permit in accordance with 40 CFR Part 124.15. <br /> Prior to receiving authorization to drill any new wells permitted by the subject permit, <br /> NCPA must submit detailed drilling procedures and proposed well construction <br /> specifications for EPA approval in accordance with Part 11,Section A, Paragraph 2(a) of <br /> the subject permit: <br /> Prior to each demonstration required in the following sections B through <br /> D, the Permittee shall submit plans for procedures and specifications to the <br /> U.S. Environmental Protection Agency Region IX Ground Water Office <br /> ("EPA") for discussion and approval. The submittal address is provided in <br /> Section E, paragraph 5. No demonstration in these sections may proceed <br /> without prior written approval from EPA. <br /> In addition,NCPA must satisfy the requirement described in Part II, Section B,Paragraph <br /> I(a) of the subject permit prior to receiving authorization to drill any new wells permitted <br /> by the subject permit: <br /> Prior to drilling any well, the Permittee must submit proposed field <br /> coordinates (Section, Township, Range, with latitude/longitade) for the <br /> surface location of that specific well; for subsequent wells, also provide <br /> the distance between all wells, along with any justification for the <br /> proposed separation distance between the wells, both at the surface and at <br /> total depth. <br /> Printed an Recycled Paper <br />
The URL can be used to link to this page
Your browser does not support the video tag.