Laserfiche WebLink
oof srgrfs. • 0 f,&'. <br /> 2•� � ru <br /> UNITED STATES ENVIRONMENTAL PROTECTION AGENCY <br /> REGION IX <br /> 75 Hawthorne Street <br /> San Francisco, CA 94105.3901 <br /> Mail Code WTR-9 <br /> October 16,2009 <br /> Mr. Michael DeBortoli <br /> Electrical/IT Engineer <br /> Northern California Power Agency <br /> 651 Commerce Drive <br /> Roseville,CA 95678-6420 <br /> Re: Public Notice of Intent to Issue <br /> UIC Permit No. CA10910003 <br /> Northern California Power Agency <br /> STIG-1, LEC-1, LEC-2 Class I-NH UIC Injection Wells <br /> Dear Mr.DeBortoli: <br /> This letter is to notify you that the public comment period for the subject permit came to <br /> a close with no comments having been submitted. Therefore, the United States <br /> Environmental Protection Agency, Region IX ("EPA") is issuing a final Class I-NH <br /> Underground Injection Control(UIC)permit in accordance with 40 CFR Part 124.15. <br /> Prior to receiving authorization to drill any new wells permitted by the subject permit, <br /> NCPA must submit detailed drilling procedures and proposed well construction <br /> specifications for EPA approval in accordance with Part 11,Section A, Paragraph 2(a) of <br /> the subject permit: <br /> Prior to each demonstration required in the following sections B through <br /> D, the Permittee shall submit plans for procedures and specifications to the <br /> U.S. Environmental Protection Agency Region IX Ground Water Office <br /> ("EPA") for discussion and approval. The submittal address is provided in <br /> Section E, paragraph 5. No demonstration in these sections may proceed <br /> without prior written approval from EPA. <br /> In addition,NCPA must satisfy the requirement described in Part II, Section B,Paragraph <br /> I(a) of the subject permit prior to receiving authorization to drill any new wells permitted <br /> by the subject permit: <br /> Prior to drilling any well, the Permittee must submit proposed field <br /> coordinates (Section, Township, Range, with latitude/longitade) for the <br /> surface location of that specific well; for subsequent wells, also provide <br /> the distance between all wells, along with any justification for the <br /> proposed separation distance between the wells, both at the surface and at <br /> total depth. <br /> Printed an Recycled Paper <br />