My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
WORK PLANS
EnvironmentalHealth
>
EHD Program Facility Records by Street Name
>
T
>
THORNTON
>
12751
>
2900 - Site Mitigation Program
>
PR0528038
>
WORK PLANS
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
9/26/2019 9:35:34 AM
Creation date
9/26/2019 9:33:40 AM
Metadata
Fields
Template:
EHD - Public
ProgramCode
2900 - Site Mitigation Program
File Section
WORK PLANS
RECORD_ID
PR0528038
PE
2950
FACILITY_ID
FA0018998
FACILITY_NAME
NCPA LODI ENERGY CENTER
STREET_NUMBER
12751
Direction
N
STREET_NAME
THORNTON
STREET_TYPE
RD
City
LODI
Zip
95242
APN
05513016
CURRENT_STATUS
01
SITE_LOCATION
12751 N THORNTON RD
P_LOCATION
02
P_DISTRICT
004
QC Status
Approved
Scanner
SJGOV\wng
Tags
EHD - Public
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
84
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
r <br /> Stantec <br /> PEA WORKPLAN <br /> Proposed Lodi Energy Center Site <br /> Lodi, California <br /> 5.4.1 Soil <br /> Depth-discrete soil samples will be collected from each proposed soil boring location (locations <br /> 8 through 27 and Background) at the time of drilling. Depending on depth, soil samples will be <br /> collected with an Impact Sampler (i.e., a slide hammer) or from the acetate'liner of the direct <br /> push sampler in each soil boring. Soil samples will be collected in stainless steel/brass sleeves, <br /> or acetate liners for non-volatile constituents; and will be collected using EPA Method 5035 <br /> collection methodologies for volatile constituents. An experienced Stantec geologist or <br /> environmental scientist working under the supervision of a California Professional Geologist will <br /> conduct the soil sampling. The results of the soil sampling will be documented on a Field Drill <br /> Log form. Additional information on specific soil sampling and documentation procedures is <br /> included in the SAP (Appendix D). <br /> 5.4.2 Groundwater <br /> Collection of one groundwater sample from existing onsite monitoring well WSM-3 (Figure 2) is <br /> proposed. This well will be purged and sampled in accordance with Stantec's Standard <br /> Operating Procedure (SOP) for groundwater sampling (Appendix D). This procedure includes <br /> purging at least three casing volumes and collection of a groundwater sample. The purged <br /> groundwater will be containerized until proper disposal can be arranged. <br /> An experienced Stantec geologist or environmental scientist working under the supervision of a <br /> California Professional Geologist will conduct the groundwater sampling activities. Each <br /> groundwater sample collected will be documented on a Groundwater Sample Collection form. <br /> 5.5 BACKGROUND SAMPLING <br /> In accordance with the DTSC PEA Guidance Manual (PEA Manual Section 2.4.2.5), collection <br /> of background samples is proposed. The background samples are proposed to be located in <br /> the vicinity of the background soil samples previously collected by NCPA's environmental <br /> consultant, which is east of the Site beyond the existing WPCF facility and west of the 1-5 <br /> freeway (Figure 2). This location was chosen because it has not been developed or altered <br /> from prior to construction of the WPCF. Four background locations are proposed designated as <br /> BG-4 through BG-8. The numbering scheme continues in consecutive order from the prior <br /> background samples to avoid confusion. Soil samples will be collected at the four proposed <br /> locations in the same manner and at the same depths as the onsite soil samples (Section <br /> 5.4.1). The proposed laboratory analyses for the background samples are listed in Table 1, and <br /> selection of analytical parameters is based on analysis for naturally occurring constituents, as <br /> well as detection of other constituents during NCPA's prior background sampling. <br /> 5.6 SAMPLE ANALYSIS <br /> The sampling strategy for the Site is summarized on Table 1. This table includes the proposed <br /> laboratory analyses by sample location for the media to be tested. <br /> PEA WP-Lodi 11 August 13,2009 <br />
The URL can be used to link to this page
Your browser does not support the video tag.