Laserfiche WebLink
Comments: <br /> Routine waste tire inspection done on this date and the following was noted: <br /> No violations or areas of concern. <br /> Notes: <br /> 1.) Permission to conduct inspection was granted by Dan Costa (Transportation Manager). <br /> 2.) TPID certificate is posted inside the shop. <br /> 3.) 12 waste tires were counted directly. <br /> 4.) Facility was given the waste tire receipt and removal recordkeeping log. <br /> 5.) Retain all waste tire logs, receipts and manifests for 3 years. <br /> 6.) Facility only stores it waste tires at this location. <br /> 7.) Inspection report emailed to dcosta@americanpavementsystems.com. <br /> ti <br />