Laserfiche WebLink
RESNA SITE SAFETY PLAN <br /> FACII.ITY BACKGROUND <br /> Hydrocarbon impacted soils were encountered during road construction activities. The <br /> impacted area was immediately backfilled pending approval of a workplan for soil <br /> excavation. <br /> WORK PLAN <br /> Task One: Excavation of hydrocarbon impacted soil. <br /> Task Two: Sample verification collection. <br /> PAGE 2 <br />