Laserfiche WebLink
RESNA SITE SAFETY PLAN <br /> Physical Hazards <br /> Tasks) Hazard Mitigation Measure <br /> 1, 2 Heavy Equipment (Noise & Physical All heavy equipment used on this project will be <br /> contact) in good working order and operated in <br /> accordance with recognized industry standards <br /> and Cal-OSHA Title 8, Subchapter 4, <br /> Construction Safety Orders. In addition, an <br /> exclusion zone applies to all personnel. The <br /> exclusion zone will be 20 feet to the front and <br /> either side of the operating drill rig. Personnel <br /> will not be allowed under booms or augers at <br /> any time. <br /> All equipment operators and ground crews <br /> working in dose proximity of heavy equipment <br /> will be supplied with ear protection. <br /> 1, 2 Dust The dust hazard will be mitigated by not <br /> allowing ground crew to be located down wind <br /> of drilling and excavation activity. In addition, <br /> water will be applied to control the dust if <br /> visible levels of dust are generated. <br /> 1, 2 Traffic Delineate work area with barricades and caution <br /> tape. <br /> Fire and Explosion Hazards <br /> List Flammable or Combustible materials on-site. Keep sources of ignition away from these materials. <br /> Flammable (Flash Point <100 °F) Combustible (Flash Point <200 °F) <br /> Gasoline Diesel <br /> Type and Location of Fire Extinguishers (Show on map for large projects): Located within RESNA <br /> vehicle. <br /> PAGE 4 <br />